|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 2,1999 PSA#2274U. S. Army Engineer District, Savannah, P.O. Box 889, Savannah, Georgia
31402-0889 C -- ANNUAL ANNOUNCEMENT FOR IDIQ CONTRACTS FOR MISCELLANEOUS A-E
SERVICES, UNDER THE JURISDICTION OF SAVANNAH DISTRICT POC Joel Kreger
(Technical Questions)912/652-5465; Leila Hollis (Contractual
Questions)912/652-5105 WEB: Corps of Engineers, Savannah District,
Contracting, http://www.usace.army.mil. E-MAIL: Leila Hollis,
leila.hollis@sas02.usace.army.mil. THE FOLLOWING INFORMATION SHOULD BE
DELETED in the CBD marked -- -- - 2. PROJECT INFORMATION: ******* All
CADD design files must be originated in Bentley's Microstation SE and
in compliance with the Tri-Service AEC Standard as applied by the
Savannah District. The Savannah District AEC Standard will address
naming convention, cell libraries, line styles, etc. and items specific
to each design. ** THIS SHOULD BE CHANGED TO READ AS: All design files
must originate in and be delivered in the (*.dgn) format. Exceptions
may be granted if the use of scanned files is required. In this case
the scanned files must be converted to (*.dgn) format for delivery. All
design files will be developed using the Tri Service AEC Standard as
supplemented by the Savannah District instructions. The standards
include naming convention, file and directory structure, line weights,
levels, and color. Any deviation shall be approved by the Contracting
Officer. DELETE THE FOLLOWING INFORMATION IN SECTION 3. SELECTION
CRITERIA: See Note 24 for general A-E selection process. The selection
criteria are listed below in descending order of importance. Criteria
a-e is primary. Criteria f-g is secondary and will be used as
"tie-breakers" among technically equal firms. **** a. Specialized
experience and technical competence in: 1) Originating designs in
Bentley's Microstation SE. Provide discussion of this experience in
Block 10 of SF 255. (2) Design of additions and alterations of
buildings, road drainage and utility systems, (3) Design of new
buildings, roads, drainage and utility systems, (4) Engineering studies
and project planning, (5) Engineering studies and project planning, (6)
Lead based paint and asbestos sampling/analysis/abatement design and
air monitoring during abatement/construction process, (7) Shop drawing
review, construction phase services and preparation of O&M manuals
****** REPLACE THIS INFORMATION TO READ AS: 3. SELECTION CRITERIA: See
Note 24 for general A-E selection process. The selection criteria are
listed below in descending order of importance. Criteria a-e is
primary. Criteria f-g is secondary and will be used as "tie-breakers"
among technically equal firms. **** a. Specialized experience and
technical competence in: (1) Design of additions and alterations of
buildings, road drainage and utility systems, (2) Design of new
buildings, roads, drainage and utility systems, (3) Engineering studies
and project planning, (4) Engineering studies and project planning, (5)
Lead based paint and asbestos sampling/analysis/abatement design and
air monitoring during abatement/construction process, (6) Shop drawing
review, construction phase services and preparation of O&M manuals (7)
Originating design files in (*.dgn) format. ********THE FOLLOWING NEEDS
TO BE CHANCED IN: 4. SUBMISSION REQUIREMENTS: Firms desiring
consideration shall submit ONE (1) copy of SF 255 (11/92 VERSION ONLY,
WILL BE ACCEPTED) for prime and ONE (1) copy of SF 254 (11/92 VERSION
ONLY, WILL BE ACCEPTED) for prime and each consultant (extra copies
will not be kept) to the following address: U.S. Army Engineer
District, Savannah, ATTN: CESAS-EN-ES (Linda Smulevitz), 100 W.
Oglethorpe, Savannah, GA 31401-3640**** All other information will
remain the same. Posted 01/29/99 (W-SN292645). (0029) Loren Data Corp. http://www.ld.com (SYN# 0014 19990202\C-0001.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|