COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 2,1999 PSA#2274U. S. Army Engineer District, Savannah, P.O. Box 889, Savannah, Georgia
31402-0889 C -- AMMO HOLDING AREA -- FORT BRAGG, NORTH CAROLINA SOL
DACA21-99-R-0008 POC Charles Grainger (Technical
Questions)912/652-5642; Rod Hill (Contractual Questions)912/652-5301
WEB: Corps of Engineers, Savannah District, Contracting,
http://www.usace.army.mil. E-MAIL: Roderick Hill,
roderick.hill@sas02.usace.army.mil. THE FOLLOWING INFORMATION SHOULD BE
DELETED in the CBD marked -- -- - 2. PROJECT INFORMATION: ******* All
CADD files must be originated in Bentley's Microstation SE and in
compliance with the Tri-Service AEC Standard as applied by the Savannah
District. The Savannah District AEC Standard will address naming
convention, cell libraries, line styles, etc. and items specific to
each design. **** THIS SHOULD BE CHANGED TO READ AS: All design files
must originate in and be delivered in the (*.dgn) format. Exceptions
may be granted if the use of scanned files is required. In this case
the scanned files must be converted to (*.dgn) format for delivery. All
design files will be developed using the Tri Service AEC Standard as
supplemented by the Savannah District instructions. The standards
include naming convention, file and directory structure, line weights,
levels, and color. Any deviation shall be approved by the Contracting
Officer. DELETE THE FOLLOWING INFORMATION IN SECTION 3. SELECTION
CRITERIA: See Note 24 for general A-E selection process. The selection
criteria are listed below in descending order of importance. Criteria
a-e is primary. Criteria f-g is secondary and will be used as
"tie-breakers" among technically equal firms. **** a. Specialized
experience and technical competence in: (1) Originating design in
Bentley's Microstation SE. Provide discussion of this experience in
Block 10 of SF 255. (2) Design of projects that include ammunition
storage magazines. (3) Design of industrial type storage and material
handling/assembly buildings. (4) Design of projects that include IDS
and EMCS. ****** REPLACE THIS INFORMATION TO READ AS: 3. SELECTION
CRITERIA: See Note 24 for general A-E selection process. The selection
criteria are listed below in descending order of importance. Criteria
a-e is primary. Criteria f-g is secondary and will be used as
"tie-breakers" among technically equal firms. **** a. Specialized
experience and technical competence in: (1) Design of projects that
include ammunition storage magazines. (2) Design of industrial type
storage and material handling/assembly buildings. (3) Design of
projects that include IDS and EMCS. (4) Originating design in (*.dgn)
format. **** All other information will remain the same. The original
CBD was published on 11 January 1999 making the closing date 10
February 1999 which will remain the same. Posted 01/29/99 (W-SN292641).
(0029) Loren Data Corp. http://www.ld.com (SYN# 0015 19990202\C-0002.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|