COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 3,1999 PSA#2275National Park Service -- Philadelphia Support Office, 200 Chestnut
Street -- 3rd Floor, U.S. Custom House, Philadelphia, PA 19106 Y -- DAM SAFETY REPAIRS AT DELAWARE WATER GAP NRA SOL 1443RP400099006
DUE 032299 POC Marie E. Killian, Contracting Officer, (215) 597-0050
E-MAIL: contact Contracting Officer via e-mail, Marie_Killian@nps.gov.
The National Park Service intends to enter into a Firm Fixed Price
contract for Dam Safety Repairs consisting of 4 earth fill embankment
dams ranging in height from 6.5 to 20 feet, overflow spillways and one
outlet work replacement. These dams are located within the Delaware
Water Gap National Recreation Area, Bushkill, Pennsylvania for Pickeral
Lake, Whitsell Lake, Egypt Mill Pond, and Hidden Lake Dams. This
procurement will involve the use of source selection procedures. The
technical criteria is as follows: 1. Past Experience (40%) -- provide
a history of contracts and supporting documentation of past success
with corporate management of earthwork and reinforced concrete
construction projects similar in planning methodology, construction
techniques and quality control tolerances as that required within the
solicitation specifications a) Description of Project: owner, project
size, dollar value; b) Method of contracting: government, private
sector, prime, sucontractor, joint venture; c) Samples ofability to
complete a complex project within the short 4 month construction period
identified for this project. 2) Key Personnel and Equipment (25%) --
Identify key personnel and equipment that will be used. Demonstrate
that personnel have adequate experience and performance; a) Project
managers, site superintendents, foremen, safety representatives and
quality assurance personnel; title, job description and resume or data
sheet. b) Equipment list: model numbers, quantities. Demonstrate
adequate availability. 3. Technical Plans for Construction (35%) --
Provide a comprehensive description of the proposed approach to
accomplishing the work within the four (4) month construction period:
a) technical work plan and proposed construction sequences; b)
Schedule: bar charts produced using CPM methodology showing start
dates, end dates, duration, critical path and milestones. Demonstrate
the incorporation of work plan elements, submitals and permits. C)
Additional Plans: outline proposed methods of addressing Environmental
and Social constraints as identified in the solicitation: erosion
control, work site disturbance limits, dust control, traffic control
and noise abatement. The estimated cost is between $500,000 and
$1,000,000. The time of performance is a mandatory four (4) months
beginning 1 May 1999. Subcontracting Plan is required. Only written or
faxed requests for solicitation will be honored. Fax No. (215)
597-1085. No telephone requests will be honored. Posted 02/01/99
(W-SN293446). (0032) Loren Data Corp. http://www.ld.com (SYN# 0154 19990203\Y-0018.SOL)