Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 12,1999 PSA#2282

General Services Administration, Public Buildings Service (PBS), Mountain-Plains Service Center (8PMP), Denver Federal Center, Building 41, West 6th & Kipling Streets, Denver, CO, 80225-0546

Z -- NEW GAS HEATING SYSTEM AT CLEARFIELD FEDERAL DEPOT IN CLEARFIELD, UT SOL GS-08P-99-JCC-0022 DUE 033199 POC Tracy McGrady-Barnes, Contracting Officer, Phone (303) 236-7230, Fax (303) 236-0552, Email tracy.mcgrady@gsa.gov -- Viola Shull, Contract Specialist, Phone (303) 236-1770, Fax (303) 236-1774, Email vi.shull@gsa.gov WEB: Visit this URL for the latest information about this, http://eps.arnet.gov/cgi-bin/WebObjects/EPS?ACode=P&;ProjID=GS-08P-99-J CC-0022&LocID=182. E-MAIL: Tracy McGrady-Barnes, tracy.mcgrady@gsa.gov. SIC Code 1711. Project: New Gas Heating Systems at three buildings on the Clearfield Federal Depot in Clearfield, Utah. Project No. RUT98024. Scope of Work: (1) For Building C-6: Selective demolition. Provide new boiler room in the southwest corner of Bay 3(North Bay). The new boiler room shall supply steam to three new steam coils located in the air handling unit supply air ducts which heat the building_s center bay. Make steam and condensate piping revisions. Provide boiler chemical feed, boiler feed pump unit, and sump pump. Relocate existing water softener and eye wash to the new boiler room. Provide new housekeeping pads, boiler room fire rated walls, access door and stairway at west exterior wall, painting, base, hardware. Remove existing steam unit heaters and replace with natural gas unit heaters vented through the roof. Abandon steam and condensate piping in place. Provide electrical power for mechanical equipment including conduit, wiring, circuit breakers as required. (2) For Building C-7: Selective demolition. Remove existing steam unit heaters and replace with natural gas unit heaters vented through the roof. Extend natural gas piping from the boiler room to new unit heaters. Abandon steam and condensate piping in place. Provide new electric unit heaters and thermostats in the Center Bay men_s and women_s restrooms and mechanical room. Provide control wiring from existing thermostats to new unit heaters. Provide new thermostats as required. Provide electrical power for mechanical equipment, new panel board, conduit, and wiring as required. (3) For Building D-5: Selective demolition. Remove existing steam unit heaters and replace with natural gas unit heaters vented through the roof. Extend natural gas piping from the boiler room to new unit heaters. Provide control wiring from existing thermostats to new unit heaters. Abandon steam and condensate piping in place. In the Center Bay office area remove steam unit heaters and piping and provide gas furnace and ductwork in the attic space, with ceiling supply and return diffusers for heated air distribution to the office areas. Provide combustion vent through roof. In the South Bay office area, remove existing steam unit heaters. Provide new electric baseboard heaters in office areas and electric unit heaters in boiler and rest rooms. Provide electrical power for mechanical equipment, new panel board, conduit, and wiring as required. This acquisition is being procured under the Small Business Competitive Demonstration Program, and is open for competition by both large and small businesses. The estimated construction cost range is between $250,000 and $500,000. The evaluation criteria to be used in the evaluation of offers submitted under this solicitation will be (1) Similar Experience and Past Performance, (2) Project Management Capabilities, and (3) price. In addition, those firms determined to be the most highly qualified may be required to participate in Oral Presentations following review of initial proposals. The Solicitation Issue Date will be o/a 3/1/99. The Pre-Proposal Conference / Site Visit date will be o/a 3/16/99. The date for Receipt of Proposals will be o/a 3/31/99. Award is expected to take place o/a 4/22/99. Notice to Proceed is expected to be issued o/a 5/3/99, with contract completion in 150 calendar days. All responsible sources will be considered. For copies of the solicitation, submit your written requests to the Contracting Officer at the address listed above, or fax requests to Tracy McGrady-Barnes at (303) 236-0552. All requests must include the Solicitation Number, project title, Contractor's company name and STREET address, point of contact with phone number, and fax number. Only written requests will be honored. This solicitation is not available electronically. All requests must be received by COB on 3/19/99, unless the solicitation closing date is extended. Posted 02/10/99 (D-SN297022). (0041)

Loren Data Corp. http://www.ld.com (SYN# 0139 19990212\Z-0004.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page