COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 26,1999 PSA#2291Federal Bureau of Prisons, Western Regional Office -- Contracting, 6600
Goodfellow, Dublin, California 94568 Z -- DESIGN AND INSTALL AN IN-RACK (STORAGE RACKS) FIRE SPRINKLER
SYSTEM. SOL 279-0000 DUE 042899 POC Jim Cooper 925-803-2775 E-MAIL:
Click here to contact the contracting officer (Jim, JCooper@bop.gov.
The Federal Bureau of Prisons (FBOP) will be soliciting prospective
contractors to design and install an in-rack fire sprinkler system in
two storage buildings. This work will require modifying an existing
sprinkler system to bring it into compliance with applicable codes.
System design, materials, installation and testing must meet or exceed
current National Fire Protection Association (NFPA), National
Electrical Code (NEC), and the Uniform Building Code (UBC)
requirements. Any conflict in code requirements will be resolved by
relying on the requirements of the most stringent code as determined by
the Contracting Officer. The estimated price range of this procurement
is between $100,000 and $250,000. Basically, the requirements call for
engineered drawings to be developed and stamped certified by a Fire
Protection Engineer. Provide all materials and labor necessary for a
complete, tested and approved system. One part of the Statement of Work
(SOW) calls for the protection of exposed steel beams eitherby
sprinkling or covering with a fireproof material. All contractor and
subcontractor employees must be able to pass the necessary security
checks before they can work on prison property. All clearance
investigations will be conducted by the FBOP. The work site is at the
Federal Prison complex, 27072 Ballston Road, Sheridan, Oregon, 97378.
This is a pre-solicitation announcement. We anticipate issuing the
solicitation announcement on March 12, 1999 and issuing the
solicitation on March 29, 1999. A pre-bid/proposal on-site visit is
tentatively scheduled for the week of April 5, 1999. While the
pre-bid/proposal on-site site visit is not mandatory, it is highly
recommended. Offerors are warned that site conditions could affect the
cost of performance. The basic drawings of the existing structures and
sprinkler systems will be available for viewing during the
pre-bid/proposal on-site visit. The bid opening or proposal due date is
tentatively scheduled for April 28, 1999. Contract award should be
within seven days after bid opening or proposal receipt, dependent on
all necessary approvals being received. A preconstruction conference
will be scheduled as soon after contract award as practical. A Notice
to Proceed (NTP) will be issued at the preconstruction conference. The
performance period will be 45 calendar days from the issuance date of
the Notice to Proceed (NTP). This procurement is a 100% Small Business
set-aside. If you have any questions please call Jim Cooper, tel
925-803-2775, fax 925-803-2782, e-mail Jcooper@bop.gov. All requests
for the solicitation package must be in writing. Telephone requests for
the solicitation package will not be accepted. See Note 1. Posted
02/24/99 (W-SN302002). (0055) Loren Data Corp. http://www.ld.com (SYN# 0138 19990226\Z-0014.SOL)