Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MARCH 4,1999 PSA#2295

US Army Corps of Engineers, Dist New Orleans, PO Box 60267, New Orleans, LA 70160

R -- BOUNDARY MONUMENTATION AND RELATED SERVICES WITHIN THE ATCHAFLAYA BASIN, LA SOL DACW29-99-R-0009 POC Jane Kulick, Contract Specialist, 504-862-2869, FAX 504-862-2889 The following corrections are made to the previous announcement which appeared in the February 5, 1999 issue. ITEM 1. CONTRACT INFORMATION is changed to read as follows: "An approximate five-month fixed price contract between $250,000 and $750,000 is scheduled for award in or about May 1999. This announcement is open to all businesses regardless of size." ITEM 2. PROJECT INFORMATION is changed to read as follows: "All engineering services, including furnishing all personnel, transportation, equipment and materials are required in connection with the following surveying and boundary monumentation. Work will be performed on both sides of the Atchafalaya River. Work on the east side of the river will be performed in Township 6 South, Range 7 East; Township 6 South, Range 8 East in Pointe Coupee Parish; Township 7 South, Range 8 East; Township 8 South, Range 8 East in Iberville and St. Martin Parishes; Township 7 South, Range 9 East; and Township 8 South, Range 9 East in Iberville Parish. Work on the west side of the Atchafalaya River will be performed in Township 7 South, Range 6 East in St. Landry Parish. Approximately 85 miles of property boundaries will be surveyed. Work will also be performed on the east side of the Atchafalaya River in Township 6 South, Range 7 East; Township 6 South, Range 8 East in Pointe Coupee Parish; and in Township 7 South, Range 8 East in Iberville and St. Martin Parishes, LA. Approximately 56 miles of property boundaries will be surveyed. Monumentation will include, but not be limited to, corner monuments, witness posts, signs and blazing. Work shall include the research of public and Government records to obtain the necessary legal descriptons to perform boundary surveys. The Contractor shall be be required to monument the boundary line, prepare a boundary monumentation map (including associated CADD files), and provide all related field survey data." ITEM 3. MINIMUM PERSONNEL AND EQUIPMENT is corrected to read as follows: "To be considered for selection, a firm must demonstratein its SF 255 the availability of at one the following: two land surveyors registered in the State of Louisiana and currently on the payroll of the prime; five 4-person survey parties; one abstractor; and two CADD technicians." All other items remain unchanged. The closing date for this project is hereby extended. All submittals are now due by close of business of the 10th day after the date of publication of this correction. Posted 03/02/99 (W-SN303785). (0061)

Loren Data Corp. http://www.ld.com (SYN# 0068 19990304\R-0007.SOL)


R - Professional, Administrative and Management Support Services Index Page