|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 5,1999 PSA#2296SOUTHWESTNAVFACENGCOM, 1220 Pacific Highway, San Diego, CA 92132-5187 C -- A-E SERVICES FOR IQ CONTRACT FOR WATERFRONT CONSTRUCTION AND
REPAIRS AT VARIOUS LOCATIONS WITHIN SOUTHERN CALIFORNIA DIEGO, CA SOL
N68711-99-D-6318 DUE 040599 POC Brad Crawford, Contract Specialist,
619-556-7596 E-MAIL: Click here to contact Contract Specialist via
e-mail, CrawfordBE@swdiv.navfac.navy.mil. Firm Fixed Price/Indefinite
Quantity Contract for furnishing of waterfront engineering services
including design, surveys, construction support, reports, cost
estimates and related studies for projects involving waterfront
construction and repairs, including reinforced concrete piers,
quaywalls, fendering systems (i.e. foam filled fenders, prestressed
concrete fender piles and rubber buckling fenders), sheet piles,
recycled plastic piles, and dredging at various locations in the
Southern California area. The total amount of the proposed contract
shall not exceed $2,000,000. No single delivery order may exceed
$500,000. The Government has the option to extend this contract for one
additional year with delivery orders not to exceed $2,000,000 together,
$500,000 individually. The total amount of the contract (base year +
option year) shall not exceed $4,000,000. The minimum contract amount
will be $25,000. A-E selection criteria will include (in order of
importance): (1) Recent (1992 to present) specialized experience and
technical competence of the firm in design for construction and repair
of reinforced concrete piers, quaywalls, fendering systems, sheet
piles, recycled plastic piles, and dredging (if the firm has more than
one office, indicate the office to perform the work and the experience
of that office in the type of work required). DO NOT list more than a
total of 10 projects. A point of contact and current telephone number
must be listed for each project. Indicate which consultants from the
proposed team, if any, participated in the design of each project
listed. (2) Professional qualifications and recent specialized
experience of the staff in design for construction and repair of
reinforced concrete piers, quaywalls, fendering systems, recycled
plastic piles, and dredging. Provide qualifications and experience for
each member of the team who would perform design on projects under
this contract. (3) Past performance on contracts with government
agencies and private industry in terms of cost control,quality of work,
and compliance with performance schedules. Indicate by briefly
describing internal quality assurance and construction cost control
procedures and indicate team members who are responsible for monitoring
these processes. List recent awards, commendations, and other
performance evaluations (DO NOT SUBMIT COPIES). (4) Location in the
general geographic area of the projects and knowledge of the locality
of the projects, provided that the application of this criterion leaves
an appropriate number of firms given the nature and size of the
contract. (5) Capacity to accomplish the work in the required time.
Indicate the firm's present workload and the availability of the
project team (including consultants) for the specified contract
performance period and indicate specialized equipment available and
prior security clearances. (6) Demonstrated success in prescribing the
use of recovered materials and achieving waste reduction and energy
efficiency in facility design. (7) List the small or small
disadvantaged or women-owned business firms used as primary consultants
or as subconsultants. If a large business concern is selected for this
contract, they will be required to submit a subcontracting plan that
should reflect a minimum of 5% small disadvantaged business of the
amount to be subcontracted out. The Standard Industrial Code is 8711
and the annual size standard is $2.5 million. Those firms which meet
the requirements described in this announcement and wish to be
considered must submit one copy each of a SF 254 and a SF 255 for the
firm and a SF 254 for each consultant listed in Block 6 of the firm's
SF 255. One copy of the submittal package is to be received in this
office (South Bay Area Focus Team, Code 5S02.BC, 2585 Callagan Highway,
Bldg 99 NAVSTA, San Diego, CA 92136-5198) no later than 2:00 PM Pacific
Time on the due date indicated above. Should the due date fall on a
weekend or a holiday, the submittal package will be due the first
workday thereafter. Submittals received after this date and time will
not be considered. Additional information requested of applying firms:
indicate solicitation number in Block 2b, CEC (Contractor
Establishment Code) and DUNS number (for the address listed in Block 3)
and TIN number in block 3, telefax number (if any) in Block 3a, and
discuss why the firm is especially qualified based on the selection
criteria in Block 10 of the SF 255. For firms applying with multiple
offices, indicate the office which completed each of the projects
listed in Block 8 and list which office is under contract for any
contract listed in Block 9. Use Block 10 of the SF 255 to provide any
additional information desired. Personal interviews may not be
scheduled prior to selection of the most highly qualified firm. SF
255's shall not exceed 30 printed pages (double sided is two
pages/organization charts and photographs excluded, with the exception
that photographs with text will be considered as a page). All
information must be included on the SF 255 (cover letter, other
attachments and pages in excess of the 30 page limit will not be
included in the evaluation process). Firms not providing the requested
information in the format (i.e. listing more than a total of 10
projects in Block 8, not providing a brief description of the quality
control plan, etc.) directed by this synopsis may be negatively
evaluated under the appropriate selection criterion. Firms which design
or prepare specifications for a construction contract or procurement of
supplies cannot provide the construction or supplies. This limitation
also applies to subsidiaries and affiliates of the firm. This is NOT a
request for proposal. Telegraphic and facsimile SF 255's will not be
accepted. Site visits will not be arranged during the submittal period.
Posted 03/03/99 (W-SN304472). (0062) Loren Data Corp. http://www.ld.com (SYN# 0024 19990305\C-0002.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|