|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 8,1999 PSA#2297USDA, Custer National Forest, 1310 Main, Billings, MT 59105 Z -- CAMPGROUND SURFACE PREPARATION, PAVING & PAINTED TRAFFIC MARKINGS
SOL r1-08-99-20 DUE 042399 POC Contracting, Karen Michaud, (406)
248-9885 ext. 254 WOODBINE CAMPGROUND PHASE II- Project includes the
base item consisting of surface preparation, paving and painting
traffic markings on the interior loop roads of the campground, the
Stillwater Trailhead, and 2 separate patches of the existing pavement,
totalling approx. 1.8 miles in lenght. Two additive/deductive items
include Asphalt Surface Treatment (cheap seal) and paving campground
spurs. Work located in Stillwater County approx. 46 miles SW of
Columbus, MT. Estimated price range $250,000 -- $500,000. Contract
completion, Base item and Additive/deductive item #2 is 11/1/99.
Additive/deductive item #1 is 06/30/00. NOT SET ASIDE FOR SMALL
BUSINESS. Posted 03/04/99 (W-SN304968). (0063) Loren Data Corp. http://www.ld.com (SYN# 0112 19990308\Z-0006.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|