COMMERCE BUSINESS DAILY ISSUE OF MARCH 10,1999 PSA#2299Defense Energy Support Center, 8725 John J. Kingman Rd., Suite 4950, Ft
Belvoir, VA 22060-6222 91 -- DIESEL FUEL, DF2 & JET FUEL AVIATION, JA1 SOL SP0600-99-R-0070
DUE 031699 POC Mark J. Santoro, 703-767-9558 or Ray B. Bone,
703-767-9536 E-MAIL: Guatemala Solicitation SP0600-99-R-0070,
msantoro@desc.dla.mil or rbone@desc.dla.mil. High sulfur diesel fuel
#2, DF2, NSN: 9140-00-286-5294, ASTM D 975. Jet Fuel, Aviation, JA1,
NSN 9130-00-753-5026, ASTM D 1655 as modified by Clause C16.09.
Ordering period is 01 April 1999 through 15 August 1999. Initial fill
of 6,000 USG of high sulfur diesel #2 in early April to seaport at
Puerto Barrios (Item 301-341). Delivery of 189,000 of high sulfur
diesel #2 (Item 301-34) and 40,000 of jet A1 (Item 301-03) to a base
camp near Puerto Barrios. All deliveries will be into 4/2,500 gallon
HEMTT tankers and 2/1,000 gallon tank and pump units (TPUs). Delivery
trucks must be equipped with pumps. This is a combination
synopsis/solicitation for commercial items prepared in accordance with
the format in Subpart 12.6, as supplemented by additional information
included in this notice. This announcement constitutes the only
solicitation; proposals are being requested and a written solicitation
will not be issued. DESC reserves the option of evaluating offers and
awarding a contract without discussions with offerors. Therefore,
offerors' inital offer should contain their best terms from a price and
technical standpoint. The Government contemplates award of a
Requirements Type, Fixed Price with Economic Price Adjustment contract
resulting from this solicitation. Product price will escalate /
de-escalate cent for cent with changes in Shell West (STASCO) posting
for Dpk/Jet for Item 301-03 and 45 Cet 0.5%S Gasoil for Items 301-341
and 301-34. Offer prices should be based on the reference price in
effect 12 Feb 99 ($0.3800 for Dpk/Jet and $0.3400 for 45 Cet 0.5%S
Gasoil). Offerors' written proposals should be submitted in English, in
US dollars per gallon and signed by an authorized company official.
Proposals should include the following elements: price, price
structure, applicable taxes and any offeror terms and conditions.
Proposals must be received by 3 PM, local Ft. Belvoir, VA, US time on
16 March 1999. Please submit your offer via fax. Your fax should be
addressed to the BID CUSTODIAN / DESC-PCC / RM 3729 / FAX # (703)
767-8506. Please note the solicitation number (SP0600-99-R-0070) on the
fax. The following clause is hereby incorporated into this solicitation
in full text: I1.20 CLAUSES INCORPORATED BY REFERENCE (JUN 1988) This
contract incorporates one or more clauses by reference, with the same
force and effect as if they were given in full text. Upon request, the
Contracting Officer will make their full text available. Also, the
full text of a clause may be accessed electronically at these
addresses: http://farsite.hill.af.mil/ http://www-far.npr.gov/ (FAR
52.252-2) Under the provisions of Clause I1.20 above, the following
clauses are hereby incorporated into this solicitation by reference: I.
FAR/DFAR CLAUSES I1.03-1 CONTRACT TERMS AND CONDITIONS -- COMMERCIAL
ITEMS (APR 1998) (FAR 52.212-4) I1.04 CONTRACT TERMS AND CONDITIONS
REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS -- COMMERCIAL ITEMS
(OCT 1998) (FAR 52.212-5) I1.05 CONTRACT TERMS AND CONDITIONS REQUIRED
TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS APPLICABLE TO DEFENSE
ACQUISITIONS OF COMMERCIAL ITEMS (OCT 1998) (DFARS 252.212-7001) I28.21
TAXES -- FOREIGN FIXED-PRICE CONTRACTS (JAN 1991) (FAR 52.229-6) I33
INTEREST (JUN 1996) (FAR 52.232-17) I84 REQUIREMENTS (OCT 1995) (FAR
52.216-21) I115 CONTRACTOR RESPONSIBILITY FOR RETURNING UNDELIVERED
FREIGHT (APR 1984) (FAR 52.247-16) L2.05-5 INSTRUCTIONS TO OFFERORS --
COMMERCIAL ITEMS (PC&S) (DESC AUG 1998) (FAR 52.212-1 TAILORED)
K1.01-9 OFFEROR REPRESENTATIONS AND CERTIFICATIONS -- COMMERCIAL ITEMS
(OCT 1998) (FAR 52.212-3) (DEVIATION) (ALT 1) *OFFERORS ARE REQUESTED
TO INCLUDE A COMPLETED COPY OF THIS PROVISION WITH THEIR PROPOSAL. II.
DESC CLAUSES B19.02 ECONOMIC PRICE ADJUSTMENT (OVERSEAS) (DESC OCT
1993) C16.09 TURBINE FUEL, AVIATION (JET A/A1/A50/B) (DESC SEP 1998)
G9.07 ELECTRONIC TRANSFER OF FUNDS PAYMENT -- CORPORATE TRADE EXCHANGE
(DFSC OCT 1997) G18 ACCOUNTING AND APPROPRIATION (DFSC FEB 1968)
I11.01 ADMINISTRATIVE COST OF DEFAULT (DFSC APR 1997) I190.04 MATERIAL
SAFETY DATA SHEETS -- COMMERCIAL ITEMS (DFSC MAR 1996) I209.09
EXTENSION PROVISIONS (PC&S) (DFSC OCT 1994) K45 FACSIMILE INVOICING
(DFSC SEP 1988) L5.01 AGENCY PROTESTS (DESC AUG 1997) -- DLAD L54 SITE
VISIT (DFSC OCT 1992) III. ADDITIONAL TERMS AND CONDITIONS In addition
to the terms and conditions noted above and in the clauses incorporated
by reference, the following terms and conditions shall also be included
in any resultant contract: 1. DELIVERIES. All deliveries shall be made
on the day specified in the delivery order unless otherwise authorized
by the receiving activity during normal working hours of such activity,
provided that the Contractor shall have received the order at least 48
hours prior to the day so specified. 2. QUANTITY DETERMINATION. At the
Government's option, quantity may be determined at the receiving
activity on the basis of- (a) Weight, using calibrated scales; or (b)
A calibrated meter on the receiving tank system. If the Government does
not elect to use one of the methods in (a) or (b) above, the quantity
shall be determined (at the Contractor's option) on the basis of -- (a)
Calibrated meter; (b) Certified capacity tables. The tables must be
made available at the time of delivery; (c) Certified tank calibration
markers. Certified tank calibration markers will not be accepted
unless the conveyance is full to the marker and the entire quantity is
delivered; or (d) The net quantity determined at the loading point by
a calibrated loading rack meter or calibrated scales. This quantity
must be mechanically imprinted on the loading rack meter ticket that is
generated by the loading rack meter or calibrated scales. If this
method is used, the Government reserves the right to redetermine the
quantity received at time of delivery by gauging the receiving tank
before and after delivery. 3. WATER BOTTOMS. (a) Every delivery must be
free of all water bottoms prior to discharge; and (b) The Contractor is
responsible for their removal and disposal. 4. VOLUME CORRECTION.
Volume correction to gallons at 60oF (or liters at 15 degrees Celsius)
is required for all volumes of measured in tank trucks, trucks and
trailers and tank wagons which are in excess of 5,000 gallons. 5.
MEASUREMENT STANDARDS. All measurements and calibrations made to
determine quantity shall be in accordance with the most recent edition
of the API Manual of Petroleum Measurement Standards (MPMS) Outside
the U.S., other technically equivalent national or international
standards may be used. Certified capacity tables shall mean capacity
tables prepared by an independent inspector or any independent
surveyor. (1) Volume XII, Table 52, shall be used to convert cubic
meters at 15oC to barrels of 60oF. Convert liters at 15oC to cubic
meters at 15oC by dividing by 1,000. Convert gallons at 60oF to barrels
at 60oF by dividing by 42. Should foreign law restrict conversion by
this method, the method required by law shall be used. (2) If the
original measurement is by weight and quantity is required in U.S.
gallons, then -- .(A) Volume XII, Table 58, shall be used to convert
metric tons to U.S. gallons at 60oF. (3) API MPMS, Chapter 4, Proving
Systems. All meters used in determining product volume shall be
calibrated using this standard with the frequency required by local
regulation (foreign or domestic). If no local regulation exists, then
the frequency of calibration shall be that recommended by the meter
manufacturer or every 6 months, whichever is more frequent. 6.
INVOICING AND PAYMENT. (A) Overbillings -- (a) That are less than or
equal to 0.5 percent of the quantity listed on the receiving document
will be paid as originally invoiced by the Contractor when the
overbilled quantity is solely a result of a difference in measurement
techniques. (b) That exceed 0.5 percent of the quantity listed on the
receiving document will be paid based on the corrected quantity as
determined by the activity and annotated on the activity's receiving
document. (B) Underbillings will be paid as invoiced. (C)
Notwithstanding any permissible variation percentage, payment is
authorized for a percentage not to exceed 120 percent of the ordered
quantity. Payment shall be made for quantity within this allowable
variation listed on the receiving document as received and accepted by
the activity and invoiced by the Contractor. 7. VARIATION IN QUANTITY.
A variation in quantity of any item called for by this contract will
not be accepted unless the variation has been caused by conditions of
loading, shipping or packing, or allowances in manufacturing processes,
and then only to the extent, if any, specified. The permissible
variation shall be limited to a 10 percent increase / decrease. This
increase or decrease shall apply to each delivery order. 8. INSPECTION.
In addition to the inspection and acceptance procedures contained in
commercial clause I1.03-1, the following inspection procedures apply to
the jet fuel Item 301-03. Before trucks are released, the basis
analysis on the trucks needs to be approved by the in-country QAR.
Delivery requires the use of a dedicated truck, to include dedicated
discharge hoses. The QAR will witness the delivery from time of loading
to time of discharge. Posted 03/08/99 (W-SN306107). (0067) Loren Data Corp. http://www.ld.com (SYN# 0338 19990310\91-0001.SOL)
91 - Fuels, Lubricants, Oils and Waxes Index Page
|
|