COMMERCE BUSINESS DAILY ISSUE OF MARCH 10,1999 PSA#2299Contracting Squadron, 5 CONS/LGCS, 211 Missile Ave, Minot AFB, North
Dakota 58705-5027 Z -- REPLACE A/C DO-9 SOL F32604-99-Q0289 DUE 040299 POC Brian Hood,
(701) 723-4184, Contracting Officer, Lynette Parson, (701) 723-3055
WEB: click here to download a copy of RFP,
http://www.minot.af.mil/5cons/F32604-99-Q0289.htm. E-MAIL: click here
to contact the contract administrator, brian.hood@minot.af.mil. This
procurement is being offered electronically via the Minot AFB 5 CONS
Homepage, http://www.minot.af.mil/5Cons/F32604-99-Q0289.htm Faxed
requests for Bidders Mailing List will not be accepted. Contractor
shall furnish all plant, labor, equipment, and materials necessary to
accomplish Project MIN 95-0009, Replace A/C DO-9, at Minot AFB, ND in
accordance with specifications MIN 95-0009 and drawings. Work is 50%
General 35%, Mechanical and 15% Electrical. Project to include removal
of existing high-speed blower, ductwork, heating coil, cooling coil,
piping, chiller, condenser and removal of insulation, which contains
asbestos. Install new package air conditioning units with humidity
controls. Include new ductwork, insulation, electrical and grilles as
required. The work is in a restricted area. The existing high-speed
blower must remain operational until after 1 Aug 99. All work to be
accomplished in room 204, must be done in five consecutive calendar
days. Performance period to be 180 calendar days. Project magnitude is
estimated between $25,000 and $100,000. Project documents will be
available O/A 23 March 99, through the Minot AFB Homepage ONLY. Faxed
offers and offer revisions will NOT be accepted. Posted 03/08/99
(W-SN305971). (0067) Loren Data Corp. http://www.ld.com (SYN# 0148 19990310\Z-0022.SOL)