|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 16,1999 PSA#2303NASA/Goddard Space Flight Center, Code 215, Greenbelt, MD 20771 59 -- LIQUID HELIUM DEWAR SOL 552-23329-920 DUE 040299 POC Mary E.
McKaig, Contract Specialist for Simplified Acquisition, Phone (301)
286-4240, Fax (301) 286-1720, Email Mary.E.McKaig.1@gsfc.nasa.gov WEB:
Click here for the latest information about this notice,
http://nais.nasa.gov/EPS/GSFC/date.html#552-23329-920. E-MAIL: Mary E.
McKaig, Mary.E.McKaig.1@gsfc.nasa.gov. NASA/GSFC plans to issue a
Request for Quote (RFQ) for the purchase of a liquid helium dewer with
12" x 15" high working space and rotatable mounting fixture/dolly, per
the following specifications: A) Liquid helium capacity: 30 liters. B)
Time between refills: 100 hours or more. C) Thermal blanketing may be
used to achieve the hold time requirements, but it must be removable
and reattachable easily when removing shields. D) LN2 reservoir may be
used to meet the hold time requirement, or it may be met with
vapor-cooled shields. If LN2 is used, it must last at least 20 hours
between refills. E) If LN2 is used, the LN2 tank must have separate
fill and vent lines. F) Working space for component testing shares a
common vacuum space with the dewar. G) Working space dimensions shall
be approximately 12" diameter x 15" high. The working space will be
surrounded by a shield thermally and mechanically attached to the
liquid helium tank. H) Top of working space is a plate (instrument
mounting plate) that also isthe bottom of the helium tank. I) This
plate has a rectangular grid of blind bolt holes with helicoils for
8-32 screws (~0.25" deep). J) This plate shall be removable from the
tank. K) The tank seal shall be made with indium wire. L) LN2 shield
(or vapor cooled shields) must be removable so that complete access
from the top or sides is allowed to the working space to the bottom of
the tank. M) In addition, the outer shell shall be removable to allow
complete access to the LN2 tank, if used. N) Each tank shall be
removable from the dewar through the use of metal sealed flanges on the
pumping line and through the use of removable supports. O) Dewar shall
have a rotatable fixture/dolly, so that it may be rotated vertically
at least 180 degrees (that is, with the helium tank up) and rolled
freely. P) The instrument mounting plate and dewar must be able to
support a 30-pound instrument. Q) Delivery must be within 8 weeks ARO.
This procurement is being conducted under the Simplified Acquisition
Procedures (SAP). The Government does not intend to acquire a
commercial item using FAR Part 12. See Note 26. This procurement is a
total small business set-aside. See Note 1. The SIC Code and Size
Standard are 3679 and 500 employees, respectively. The DPAS Rating for
this procurment is DOC9. The anticipated release date of RFQ
552-23329-0000/920 is on or about 04/05/99 with an anticipated quote
due date of on or about 04/20/99. All qualified responsible sources may
submit a quote which shall be considered by the agency. An ombudsman
has been appointed -- See Internet Note "B". The solicitation and any
documents related to this procurement will be available over the
Internet. These documents will be in Microsoft Office Suite (Word 6.0,
Excel 5.0, or PowerPoint 4.0) format and will reside on a World Wide
Web (WWW) server, which may be accessed using a WWW browser
application. The WWW address, or URL of the NASA/GSFC Business
Opportunities home page is
http://procurement.nasa.gov/EPS/GSFC/class.html. Prospective offerors
shallnotify this office of their intent to submit an offer. It is the
offeror's responsibility to monitor this site for the release of the
solicitation and amendments (if any). Potential quoters will be
responsible for downloading their own copy of the solicitation and
amendments (if any). Any referenced notes can be viewed at the
following URL: http://genesis.gsfc.nasa.gov/nasanote.html. Posted
03/12/99 (D-SN307855). (0071) Loren Data Corp. http://www.ld.com (SYN# 0307 19990316\59-0005.SOL)
59 - Electrical and Electronic Equipment Components Index Page
|
|