Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MARCH 19,1999 PSA#2306

U.S. Department of Labor, ETA, Division of Contracting Services, 200 Constitution Ave., NW, Room S-4203, Washington, DC 20210

Y -- PY'94 NEW DORMITORY AND WATER UPGRADE SYSTEM AT THE GARY JOB CORPS CENTER SOL IFB-99-DAA-35-JC DUE 052599 POC Bruce Hoelscher, (512) 328-9551 or Marion Carter, Contract Specialist, (202) 219-8706 ext. 117 WEB: ifb-99-daa-35-jc, http://cbdnet.access.gpo.gov. E-MAIL: ifb-99-daa-35-jc, carters@doleta.gov. The work involves the construction of a new 26,844 GSF two story dormitory building and the replacement and upgrade of the domestic water supply. The work includes but is not limited to: site demolition, utilities, grading/earthwork, landscaping and paving, steel structure and conrete masonry block, fire sprinkler, elevator, plumbing, HVAC, electrical, site lighting and fire alarm system. In addition, the project has the following additive alternates: (1) Alternate No. 1 consists of the construction of the pavilion located at the end of Luke Avenue. The addition shall include concrete, masonry, metal ceiling, roofing and electrical; (2) Alternate No. 2 consists of the addition of the hydraulic passenger elevator; (3) Alternate No. 3 consist of the demolition of the 500,000 gallon below ground water storage tank and 100,000 gallon elevated tank; and (4) Alternate No. 4 consists of the installation of Ductile Iron Pipe (DIP) in leu of PVC pipe for the water distribution system. This work shall be performed at the Gary Job Corps Center in San Marcos, Texas. The construction completion date is estimated to be 406 calendar days from Notice to Proceed. The estimated cost range for construction is $1 Million to $5 Million. Plans and Specifications will be available on or about April 2, 1999 only from the Architect/Engineering firm of Croslin & Associates, 1114 Lost Creek, Boulevard, Suite 430, Austin, Texas 78746. Contact: Bruce Hoelscher at (512) 328-9551 for additional information concerning this project. Collect calls will not be accepted. It is emphasized that requests for Plans and Specifications should be directed to the A/E firm listed above to ensure proper handling of requests. A Bid Deposit in the amount of $50.00 is required which is refundable when the plans and specifications are returned in good condition. The bid deposit must be in the form of a Certified Check, Cashier's Check or money order and made payable to the U.S. Department of Labor, and submitted to Croslin and Associates, Inc., at thetime of the request. All requests will be answered on a first-come, first-serve basis until supplies are exhausted. For requests made after the supply is exhausted, the Contracting Officer may determine whether payment of a fee is warranted. The non-refundable fee shall not exceed the actual cost of duplication of the IFB documents, plus COD charges. A Pre-bid walk-thru is scheduled for April 29, 1999, at 10:00 A.M. local time. Bid Opening date is May 25, 1999, at 10:00 A.M. local time. The SIC Code is 1522 with a size standard of $17.0 million. See Numbered Note(s): 1. Posted 03/17/99 (W-SN309762). (0076)

Loren Data Corp. http://www.ld.com (SYN# 0122 19990319\Y-0008.SOL)


Y - Construction of Structures and Facilities Index Page