|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 22,1999 PSA#2307GSA Allegheny Contract SVCS Group (3PKC), The Wanamaker Building Rm
725, 100 Penn Square East, Philadelphia, PA 19107-3396 C -- A/E SERVICES, NEW FEDERAL COURTHOUSE ANNEX, WHEELING, WEST
VIRGINIA SOL GS-03P-99-CDC-0007 DUE 042299 POC Bob Waring, Contracting
Officer, (215) 656-6149 Architectural and Engineering (A/E) services
are required for a new Federal Courthouse Annex in Wheeling, West
Virginia. The selection panel has short listed the following five firms
for further consideration in Stage II of the A/E Design Excellence
evaluation process: 1. Bohlin, Cywinski, Jackson in Pittsburgh, PA; 2.
HLM Design in Bethesda, MD; 3. KCF/SHG in Washington, D.C.; 4. Perkins
Eastman Architects in Pittsburgh, PA; and 5. Robert A.M. Stern
Architects in New York, NY. The due date for receipt of Stage II
proposals is April 22, 1999. Posted 03/18/99 (W-SN310135). (0077) Loren Data Corp. http://www.ld.com (SYN# 0031 19990322\C-0012.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|