COMMERCE BUSINESS DAILY ISSUE OF APRIL 8,1999 PSA#2320DA, Tulsa District, Corps of Engineers, 1645 S. 101st East Avenue,
Tulsa, OK 74128 C -- DESIGN AND CONSTRUCTION MANAGEMENT SERVICES FOR EXISTING AND NEW
DORMITORIES, TINKER AIR FORCE BASE, OKLAHOMA DUE 051299 POC Susan
Killgore, Contract Specialist, 918/669-7270 1. CONTRACT INFORMATION: A
firm fixed price contract will be negotiated for Architect-Engineer
Services to design and provide construction management services
(option) for the completion of 34 dormitory rooms and associated
kitchens and bathrooms on the second and third floors of dormitory 5902
and construction of a new 96-Person Dormitory at Tinker Air Force Base,
Oklahoma. There are existing designs similar to the required designs,
and the majority of the design work can be a site-adaptation. Required
design services consist of all work related to the preparation of
plans, specifications, construction cost estimates, surveys, studies,
permit applications, preparation of a master network analysis schedule
(NAS) for construction by multiple specialty contractors, and
separation of work elements into 5 to 20 suitable packages for
advertisement and award. Construction management services including
answering of Requests for Information (RFIs), shop drawing and
submittal review and approval, provision of site office requirements
with utility hookups, full-time project engineer duties, field quality
control inspections, quality assurance activities, maintenance of the
master network analysis schedule, surveying, design modifications,
operation and maintenance manuals, and as-built drawing preparation may
be awarded as an option. This procurement is unrestricted. The
anticipated contract award date is July 1999. All responders are
advised that this requirement may be canceled or revised at any time
during the solicitation, evaluation, selection, and negotiation, final
award date may vary and final completion date may vary. If a large
business is selected for this contract, it must comply with FAR
52.219-9 regarding the requirement for a subcontracting plan on that
part of the work it intends to subcontract. For your information, the
subcontracting goals for Tulsa District are 65% for small business, 10%
for small disadvantaged business, and 5% woman-owned business. The plan
is not required with this submittal. 2. PROJECT INFORMATION: This
project consists of interior completion of 34 dormitory rooms,
occupying approximately 1122 SM of space in dormitory 5902, and a new
3168 SM 96-Person Dormitory . The new facility will have provisions for
an office, game room, laundry rooms, TV rooms, and a public bathroom in
addition to 48 modules capable of housing 96 persons, based on the Air
Force 1+1 design standard. Supporting facilities include utilities,
lighting, and site improvements. Estimated construction cost is between
$5M and $10M. Metric scale is required on construction drawings.
Selected A-E will be required to produce CADD drawings compatible with
MicroStation software (5.0 or higher) of Bentley Systems, access a
Computerized Automated Review Management System (ARMS) via modem,
produce cost estimates using M-CASES Gold 3, and set up and tailor a
Resident Management System (RMS) to track the submittals and assist in
the performance of the QC function. 3. SELECTION CRITERIA: See Note 24
for general selection process. The selection criteria in descending
order of importance are: A. Past Performance on DoD and other Contracts
with respect to cost control, construction management, quality of work,
compliance with delivery schedules, history of working relationships
with consultants, and overall cooperativeness and responsiveness. B.
Experience: 1. Specialized recent experience and technical competence
of the A-E firm and/or consultants, in construction management 2.
Specialized recent experience and technical competence of the A-E firm
and/or consultants in the planning, design, and construction
management of dormitories, apartments or hotels. 3. Designing within
cost limitations. 4. Design Quality management procedures --
coordination between disciplines and subcontractors. 5. Knowledge of
locality. Comparable experience of the firm and consultants on projects
completed within the last five years will be given the greatest weight.
. C. Qualified registered professional personnel with experience in the
following disciplines: project management, construction management,
architecture, electrical, mechanical, fire protection, civil,
structural, cost estimating, geotechnical and surveying. Particular
focus will be on the qualifications of the personnel with relevant
experience on similar projects. D. Knowledge of probable site locality
and conditions, materials and supplies availability, and applicable
regulatory requirements E. Sufficient capacity to complete the design
by Feb 2000. F. Volume of DoD contract awards in the last 12 months as
described in Note 24. 4. SUBMITTAL REQUIREMENTS: See Note 24 for
general submittal requirements. Interested firms having the
capabilities to perform this work must submit one copy of SF 255 (and
a SF254 for the prime firm and all consultants) to the above address no
later than 4:30 p.m. on 12 May, 1999. Solicitation packages are not
provided. This is not a request for proposal. The SF 255 should
specifically address the requirements of this announcement. Responding
firms are requested to clearly identify those tasks to be performed
in-house and at what office, and those tasks to be subcontracted and at
what office. Responding firms are requested to provide the names and
telephone numbers of clients as references in their three most recent
facility designs from Block 10. Also in Block 10 of the SF255 describe
the firm's project-specific design quality control plan, including
coordination with subcontractors. Cover letters and extraneous material
are not desired and will not be considered. Personal visits to discuss
this contract will not be scheduled. Posted 04/06/99 (I-SN316986).
(0096) Loren Data Corp. http://www.ld.com (SYN# 0041 19990408\C-0005.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|