COMMERCE BUSINESS DAILY ISSUE OF APRIL 8,1999 PSA#2320Massachusetts Bay Transportation Authority, Contract Administration,
Room 5610, 10 Park Plaza, Boston, MA 02116-3975 Y -- BRIDGE RECONSTRUCTION, BEACH STREET SOL B48CN01 DUE 051199 POC
Project Manager, Mr. Dominic O. Anidi, 500 Arborway, Jamaica Plain,
Massachusetts 02130, Telephone No. (617) 222-5914 WEB: MBTA Home page,
General Information, Projects, Contract, http//www.mbta.com/info/. The
work consists of the removal and reconstruciton of the Beach Street
Bridge steel superstructure including modifications to the existing
abutments. Also included is approach roadway and sidewalk work and
utility relocations. The reconstruction shall be performed in stages
maintaining uninterrupted use of the structure by vehicular and
pedestrian traffic. Posted 04/05/99 (W-SN316456). (0095) Loren Data Corp. http://www.ld.com (SYN# 0196 19990408\Y-0011.SOL)