COMMERCE BUSINESS DAILY ISSUE OF APRIL 9,1999 PSA#2321439 LSS/LGC, 250 Airlift Drive, Westover Air Reserve Base, Chicopee MA
01022-1525 C -- ARCHITECT AND ENGINEERING SERVICES, TITLE I AND TITLE II SOL
F19617 DUE 050899 POC Lester Howard or Michael LaFortune (Contracting
Officer) at 413/557-2137 Architect-Engineer Services, Title I and Title
II, Open End Contract for the development of site investigation, design
plans, and specifications for maintenance, repair and minor
construction and inspection services for various construction projects
at Westover ARB, MA. One contract to a multidiscipline firm which has
in-house expertise in Architecture and may have in-house or joint
venture expertise in the related Engineering Disciplines (Civil,
Electrical, Environmental, Mechanical, Structural, and Interior
Design). A/E firm must meet all state licensing requirements of the
state in which they are incorporated or principally do business. The
anticipated indefinite quantity contract will have a maximum monetary
limit of $250,000.00 per year with a minimum of $5,000.00 guaranteed
for the life of the contract, against which individual delivery orders
of up to $99,000.00 may be written. However, the initial delivery
order to be issued at the time of award may exceed $99,000.00. A/E
firms will be evaluated on the basis of the following factors, each of
equal value: (a) Specialized experience and technical competence; (b)
Professional qualifications; (c) Capacity for timely accomplishment of
work; (d) Past performance; (e) Geographic location; (f) Volume of
previously awarded DOD work. the general intent is to award a contract
to a multi-discipline A/E firm with the Standard Industrial
Classification (SIC) Code of 8712, Architectural Services. the initial
projects for the contract will be as follows: Project YTPM 95-0108,
Alter/Repair Command Post. The project consists of renovation of the
Base Command Post which occupies approximately 2000 sf of an existing
8700 sf building. The building will remain occupied during
construction. Extent of design will include development of conceptual
space layouts, demolition of existing non structural partitions, floor
slabs, ceilings, electrical and mechanical as required. Provide new
wall partitions, ceilings, floor slabs, and electrical. Project YTPM
98-0106, Repair HVAC Command Post. This project repairs an existing air
conditioning system by replacement. Existing system capacity does not
match the building load due to operational changes. This system serves
the area to be remodeled under project YTPM 95-0108 above. The A/E
will be responsible for a complete system design including development
of heat loads, component sizing and all other required tasks. The
governments desired system will consist of a forced air conditioning
system to serve the space with DX type environmental systems to serve
electronics areas. Command Post area is subject to high security and as
such the design will be required to meet government regulations
regarding the transmission of sound or electromagnetic signals across
the space boundaries. All work will comply with applicable national,
state, and local building and life safety codes, Air Force design
instructions and facility standards, ADA and Massachusetts
accessibility codes, and all other applicable structural, mechanical,
electrical, plumbing and other codes and regulations in effect during
the design period. The prospective A/E firms must submit typed
responses to the following issues in a separate sealed envelope in
addition to submission of SF Form 254 and SF Form 255: (a) Key
individuals who will work on the project including project manager
and/or architect, etc; (b) Proposed team of individuals for the design
and production phases; (c) Proposal of how the A/E firm intends to
address the design tasks noted above, e.g., the specifications
regarding hazardous materials will be addressed by consultant,
in-house, or other; (d) Discussion of the firm's technical
qualifications and previous experience with similar work; (e)
Discussion of how the firm's organization, capacity and current
workload applies to the project. Firms responding to this announcement
on or before 08 May 1999 wil be considered for selection. Firms
desiring consideration shall submit appropriate data as described in
numbered Note 24. This is not a request for proposal.*****
Architect-Engineer Services, Title I and Title II, Open End Contract
for the development of site investigation, design plans, and
specifications for maintenance, repair and minor construction and
inspection services for various construction projects at Westover ARB,
MA. One contract to a multidiscipline firm which has in-house
expertise in Architecture and may have in-house or joint venture
expertise in the related Engineering Disciplines (Civil, Electrical,
Environmental, Mechanical, Structural, and Interior Design). A/E firm
must meet all state licensing requirements of the state in which they
are incorporated or principally do business. The anticipated indefinite
quantity contract will have a maximum monetary limit of $250,000.00 per
year with a minimum of $5,000.00 guaranteed for the life of the
contract, against which individual delivery orders of up to $99,000.00
may be written. However, the initial delivery order to be issued at
the time of award may exceed $99,000.00. A/E firms will be evaluated on
thebasis of the following factors, each of equal value: (a) Specialized
experience and technical competence; (b) Professional qualifications;
(c) Capacity for timely accomplishment of work; (d) Past performance;
(e) Geographic location; (f) Volume of previously awarded DOD work. the
general intent is to award a contract to a multi-discipline A/E firm
with the Standard Industrial Classification (SIC) Code of 8712,
Architectural Services. the initial projects for the contract will be
as follows: Project YTPM 95-0108, Alter/Repair Command Post. The
project consists of renovation of the Base Command Post which occupies
approximately 2000 sf of an existing 8700 sf building. The building
will remain occupied during construction. Extent of design will include
development of conceptual space layouts, demolition of existing non
structural partitions, floor slabs, ceilings, electrical and mechanical
as required. Provide new wall partitions, ceilings, floor slabs, and
electrical. Project YTPM 98-0106, Repair HVAC Command Post. This
project repairs an existing air conditioning system by replacement.
Existing system capacity does not match the building load due to
operational changes. This system serves the area to be remodeled under
project YTPM 95-0108 above. The A/E will be responsible for a complete
system design including development of heat loads, component sizing and
all other required tasks. The governments desired system will consist
of a forced air conditioning system to serve the space with DX type
environmental systems to serve electronics areas. Command Post area is
subject to high security and as such the design will be required to
meet government regulations regarding the transmission of sound or
electromagnetic signals across the space boundaries. All work will
comply with applicable national, state, and local building and life
safety codes, Air Force design instructions and facility standards, ADA
and Massachusetts accessibility codes, and all other applicable
structural, mechanical, electrical, plumbing and other codes and
regulations in effect during the design period. The prospective A/E
firms must submit typed responses to the following issues in a separate
sealed envelope in addition to submission of SF Form 254 and SF Form
255: (a) Key individuals who will work on the project including project
manager and/or architect, etc; (b) Proposed team of individuals for the
design and production phases; (c) Proposal of how the A/E firm intends
to address the design tasks noted above, e.g., the specifications
regarding hazardous materials will be addressed by consultant,
in-house, or other; (d) Discussion of the firm's technical
qualifications and previous experience with similar work; (e)
Discussion of how the firm's organization, capacity and current
workload applies to the project. Firms responding to this announcement
on or before 08 May 1999 wil be considered for selection. Firms
desiring consideration shall submit appropriate data as described in
numbered Note 24. This is not a request for proposal.***** Posted
04/07/99 (W-SN317485). (0097) Loren Data Corp. http://www.ld.com (SYN# 0040 19990409\C-0007.SOL)