COMMERCE BUSINESS DAILY ISSUE OF APRIL 12,1999 PSA#2322Department of the Army, Baltimore District, Corps of Engineer, 10 South
Howard Street, Room 7000, Baltimore, MD 21201-1715 Z -- ROOF REPAIR AND REPLACEMNT STEVENS ELEMENTARY SCHOOL, DISTRICT OF
COLUMBIA PUBLIC SCHOOLS, WASHINGTON, DC SOL DCPSOC-99-B-0023 DUE 052599
POC Betty Schneider or Esther Foster (410)962-3464 or 5638 This
procurement is unrestricted, SIC 1761 size standard $7.0 million.
Estimated cost of construction is between $500,000.00 and
$1,000,000.00. Period of performance is 60 days from the issuance of
the Notice to Proceed. Contractor is required to provide all labor,
materials, supervision and equipment to repair and replace the roof at
Stevens Elementary School, 21st and K Street NW, Washington, DC as
follows: The project consists of replacing eight roofs. Five of them,
Roofs A, B, C, D, E, H, and H1 are slate roofs and shall be removed and
replaced in-kind. All existing flashing, gutters, and downspouts shall
be removed and replaced. Approximately 20% of the wood decking shall
be removed and replaced at the eaves, valleys, and ridges. Repair
existing cornice profile if necessary, strip, prime and repaint it in
its entirety. Replace water damaged or rotten wood trim to match
existing cornice profile. Batt insulation shall be provided throughout
attic space. Provide bird screens at all attic louvers. Masonry
chimneys shall be repointed as necessary. Roofs F and G are tin roofs
and shall be replaced with standing seam metal roof down to existing
wood decking. Approximately 15% of the wood decking shall be removed
and replaced at the eaves, valleys, and ridges. Repair existing cornice
profile if necessary, strip, prime and repaint it in its entirety.
Replace water damaged or rotten wood trim to match existing cornice
profile. Batt insulation shall be provided throughout attic space.
Masonry chimneys shall be repointed as necessary. Roof J is a built-up
roof (BUR) and shall be removed down to metal deck along with all
insulation, flashing, gutter and downspout. The built-up roof shall be
replaced in-kind. Remove and replace broken glass and single pane
glass and replace with wire glass. All responsible sources may submit
a bid which shall be considered by the agency. Specifications are
$20.88; Non-Refundable. WE DO NOT ACCEPT PERSONAL CHECKS, ONLY COMPANY
CHECKS OR MONEY ORDER. Make check or money order payableto FAO, USAED
Baltimore, and mail to the attention of CENAB-CT. No cash accepted.
Issuance o/a 23 April 1999 bid opening date o/a 25 May 1999. POC for
this action is Lydia A. Hill (202)529-2218. Posted 04/08/99
(W-SN317665). (0098) Loren Data Corp. http://www.ld.com (SYN# 0155 19990412\Z-0013.SOL)