COMMERCE BUSINESS DAILY ISSUE OF APRIL 13,1999 PSA#2323US Army Corps of Engineers, Dist New Orleans, PO Box 60267, New
Orleans, LA 70160 C -- AUTOMATED REVETMENT SURVEYS ON MISSISSIPPI, ATCHAFALAYA, AND RED
RIVERS SOL DACW29-99-R-0015 POC Eileen Upton, Contract Specialist
504/862-1996 1. CONTRACT INFORMATION: The New Orleans District Corps of
Engineers intends to contract for A-E services to perform hydrographic
surveys on the Mississippi, Atchafalaya, and Red Rivers. A firm
fixed-price contract for a period of eight months is scheduled for
award in November 1999, to be completed June 2000. Estimated total cost
of the proposed services is between $500,000 -- $800,000. This
announcement is open to all businesses regardless of size. If a large
business is selected for this contract, it must comply with FAR
52.219-9 regarding the requirement for a subcontracting plan on that
part of the work it intends to subcontract. The plan is not required
with this submittal. 2. PROJECT INFORMATION: The New Orleans District
requires Hydrographic & Topographic surveys obtained using Differential
Global Positioning Systems (DGPS) and automated sounding systems for
its revetment and preconstruction surveys at selected locations on the
Mississippi, Atchafalaya and Red Rivers. Pre-construction revetment
surveys shall consist of approximately 229 ranges over 5.3 miles of
river bank at 2 proposed sites on the Atchafalaya River and 4 proposed
sites on the Mississippi River. Existing revetment surveys shall
consist of approximately 13,500 ranges over 275 miles of river bank at
85 sites on the Mississippi River and approximately 2,319 ranges at 36
sites on the Atchafalaya River and at 3 sites on the Red River.
Soundings will be provided at approximately 20 foot intervals on each
range. Firms must indicate capability of using both multi-beam
bathymetric and single tranducer technology to obtain hydrographic
surveys. Overbank surveys will be made at all preconstruction sites and
major bank failures as described in the contract. All survey data for
each range, no matter how the data is obtained shall be edited,
combined, transmitted electronically (or furnished on compact disk
(CD), in the format specified in the contract. CADD and/or chart
requirements shall be furnished in the format specified in the
contract. 3. SELECTION CRITERIA: See Note 24 for general selection
process. Selection evaluation factors in descending order of precedence
are: (1) Specialized experience and technical competence in the
required time. (2) Relative to capacity, the A-E shall list the
availability of the following minimum personnel and equipment: one
registered land surveyor, one 4-person shore control survey party,
three 2-person hydrographic surveying crews, each equipped with a
minimum 18' survey boat with cabin, and with DGPS and automated depth
sound equipment, of which 1 crew is to be outfitted with multi-beam
system. (3) Past performance on contracts with Government agencies and
private industry in terms of cost control, quality of work, and
compliance with performance schedules, and a quality control plan
appropriate for the scope of work; (4) Professional qualifications
necessary for satisfactory performance of required services; (5) Safety
plan and performance (man-hours lost in the last 100,000 worked); (6)
Geographic proximity of firm; (7) Volume of DOD contract awards in the
last 12 months as described in Note 24; (8) Extend of participation of
SB, SDB, historically black colleges and universities, and minority
institutions on the proposed contract team, measured as a percentage of
the estimated effort. For the Safety Plan and Quality Control Plan,
skeletal outline demonstrating the content of such plans are
sufficient; however, not addressing these items will be viewed as
non-responsive. Criteria 1 through 5 are primary. Criteria 6 through 8
are Secondary and will only be used as " tie breakers " among
technically equal firms. SUBMISSION REQUIREMENTS: See Note 24 for
general submission requirements. Interested firms having the
capabilities to perform this work must submit 5 copies of SF 255's and
5 copies of the SF 254's and any other pertinent information for the
prime and all subcontractors. The eight evaluation factors listed above
must be addressed in block 10 of the SF 255 for the prime contractor as
well as all subcontractors and consultants to the address below not
later than the close of business on the 30th day after the date of
publication of this announcement. If the 30th day is a Saturday, Sunday
or Federal holiday the deadline is the close of business of the next
business day. Include the Firm's ACASS number in block 3b of the SF255.
For ACASS information, call |(503) 808-4594. Overnight or courier type
mail should be sent to the following address: U.S. Army Corps of
Engineers, New Orleans District, CEMVN-CT-T, Attn: Eileen Upton, Foot
of Prytania Street, New Orleans, La 70118-1030. Solicitation packages
are not provided. This is not a request for proposal. Refer to
Announcement No. DACW29-99-R-0015. Posted 04/09/99 (W-SN318102).
(0099) Loren Data Corp. http://www.ld.com (SYN# 0009 19990413\C-0003.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|