COMMERCE BUSINESS DAILY ISSUE OF APRIL 14,1999 PSA#2324U S Postal Service, Facilities Service Office, 8055 E Tufts Avenue,
Suite 400, Denver, CO 80237-2881 Y -- NEW CONSTRUCTION OWNED FACILITY, SOUTH JORDAN VMF, 10102 SOUTH
REDWOOD ROAD, RIVERTON UT 84095-9998 SOL 072976-99-A-0132 DUE 051399
POC Solicitation Information: Diana Esguerra, A&D Draft Aid,
303-573-5757, Contract Administration, Marcia Stencel, US Postal
Service, 303-220-6514; and for technical questions, Mark Brinckerhoff,
Frank N. Murdock Jr., and Associates, 801-532-4110 17. The US Postal
Service (USPS) is soliciting proposals for a New Construction Owned
project. The successful contractor shall provide all materials,
supplies, labor, equipment and service to construct a USPS owned
facility of approximately 23,300 square feet on 5.25 acre USPS owned
site located at 10102 South Redwood Road, Riverton, UT 84095-9998. The
contractor shall use only the technical plans and specifications for
Solicitation 072976-99-A-0132. Work includes but is not limited to
selective demolition of existing paving, fencing and site utilities;
excavation of soil as required for new construction and cut and fill as
required to allow for drainage and installation of site utilities as
shown on the drawings; construction of new building addition and
remodeling activities, complete with structure, exterior walls,
partitions, finishes, roofing, windows, automotive repair equipment,
millwork, etc., and electrical and mechanical work, as shown on
drawings and in accordance with the Specifications. Contractor will
provide and install new fencing and gates as shown on the drawings and
in accordance with the Specifications. Contractor will provide and
spread 4 inches of topsoil of all now landscaped areas and will provide
and install all fixed or post mounted signage as shown on the drawings;
and install landscaping and irrigation systems as shown on the plans,
and in accordance with the Specifications and install new finishes as
per plans. The General contractor is required to provide and maintain
safety barricades, fencing, and markings to protect customers and
employees from injury during the course of demolition and construction.
The estimated cost range is $2.4 million to $2.6 million. The
performance period is 180 calendar days from date of issuance of
Notice-to-Proceed. ONLY THE FOLLOWING PRE-QUALIFIED FIRMS WILL BE
ALLOWED TO SUBMIT PROPOSALS: FCI Contructors, Inc., Contact: John J.
Kelleher, PO Box 41940, Phoenix AZ 84080-1940, 602-789-6463, fax
602-789-6343; Fox Construction, Contact: Nellyn Cox, 2580 South 1100
West, Salt Lake City UT 841190-2426, 801-972-3103, fax 801-972-3173;
Herm Hughes & Sons, Contact: Gary V. Smith, PO Box 540700, North Salt
Lake, UT 84054-0700, 801-292-1411, fax 801-295-0530; Interwest
Construction, Contact: Max Griffin, 35 North Redwood Road, North Salt
Lake, UT 84054-2758, 801-292-6200, fax 801-936-1330; M.A. Mortenson
Company, Contact: Craig Goettsch, 910 Elkton Drive, Colorado Springs,
CO 80907-3536, 719-531-6804, fax 719-531-7945; Wade Perrow
Construction, Contact: Wade Perrow, PO Box 1728, Gig Harbor, WA
98335-1728, 253-853-2308, fax 253-851-6475; Wadman Corporation,
Contact: David L. Wadman, PO Box 1458, Ogden UT 84402-1458,
801-621-4185, 801-621-7232. Subcontractors may secure a copy of the
plans and specifications from the pre-qualified contractors or "A and
D Draft Aid". Copies will be provided to local plan rooms upon their
request. The solicitation package will be available on or about April
13, 1999, and may be obtained from A and D Draft Aid. When ordering
refer to SOLICITATION NUMBER 072976-99-A-0132 and call, mail or fax
information to "A and D DRAFT AID". To obtain a solicitation package or
for information concerning solicitation packages, correspondence should
be directed to : A AND D DRAFT-AID INC, ATTN: DIANA ESGUERRA, P O BOX
40877, DENVER CO 80204-0877, (303) 573-5757, FAX (303) 573-8714.
Proposals are due in the Denver Facilities Service Office by 3:00 PM,
MDT on May 13, 1999. Since this is a request for proposal, offers will
not be publicly opened. The number of offers received, the identity of
the offerors, the amount of any one offer, or relative standing of the
offeror will not be disclosed to anyone until after the award of
contract is made and the request is submitted in writing. Offerors are
encouraged to submit their proposal by the US Postal Service (First
Class, priority Mail, or Express Mail) Posted 04/12/99 (W-SN318510).
(0102) Loren Data Corp. http://www.ld.com (SYN# 0092 19990414\Y-0017.SOL)
Y - Construction of Structures and Facilities Index Page
|
|