COMMERCE BUSINESS DAILY ISSUE OF APRIL 15,1999 PSA#2325Purchase Services Branch, Attn: Code 535.3, Portsmouth Naval Shipyard,
Portsmouth Naval Shipyard, Portsmouth, NH 03801-2590 54 -- SCAFFOLDING SYSTEM SOL N00102-99-Q-1348 DUE 050399 POC Sherri
Martin @ fax 207-438-1251 This is a combined synopsis/solicitation for
commercial items prepared in accordance with the format in subpart
12.6, as supplemented with additional information included in this
notice. Urgency requirements will be utilized in the solicitation
process. This announcement constitutes the only solicitation;
quotations are being requested and a written solicitation will not be
issued. This solicitation is issued as Request for Quotation
N00102-99-R-1348. The solicitation document and incorporated provisions
and clauses are those in effect through Federal Acquisition Circular
97-11, Part 12. FAR clauses 52.212-1, 52.212-3, 52.212-4, 52.212-5
apply. DFARS clauses 252.212-7001 and 252.204-7004 apply. This
procurement is a total small business set-aside. The associated
standard industrial classification code is 3446. The small business
size standard is 500. Quotes must be received NO LATER THAN 3:30 PM on
03 May 1999 at Portsmouth Naval Shipyard, Contracting Division, Bldg.
153, 6th Floor, Code 530.03, Portsmouth, NH 03801-2590. This
requirement is for a SCAFFOLDING SYSTEM (1 assembly) in accordance with
the following specs: THE PURCHASE DESCRIPTION SET FORTH BELOW REFLECTS
THOSE CHARACTERISTICS WHICH ARE ESSENTIAL TO THE MINIMUM NEEDS OF THE
GOVERNMENT. INTERESTED PARTIES MUST REQUEST THE ATTACHMENTS LISTED IN
SECTION J OF THIS SPEC BY FAXING 207-438-1251. C SPECIFICATIONS C.1
SCOPE -This document covers system type scaffolding, per section J of
this spec, which can be configured to any angle 360 degrees to meet the
ever changing configurations required. C.2 REQUIREMENTS C.2.1 DESIGN
-The equipment shall be one of the manufacturer's current production
models, new and unused, capable of performing its intended function in
accordance with the operation and performance requirements specified
herein. C.2.1.1 DESIGN REQUIREMENTS -- The system shall be complete and
consist of, but is not limited to, the following principal components,
attachments and accessories to meet the requirements specified herein.
C.2.1.2 SAFETY AND HEALTH REQUIREMENTS -- C.3 ENVIRONMENTAL PROTECTION
-- The equipment shall be designed and constructed that, under the
operating, service, transportation and storage conditions described
herein, the equipment shall not emit materials hazardous to the
ecological system as prescribed by federal, state of local statues in
effect at point of installation. C.4 NEW DEVELOPMENTS -- If, during the
contract period, any new developments are generated that would improve
the efficiency, accuracy or productivity of the equipment and its
ancillary components or would decrease its operation costs, the
contractor shall immediately notify the Contracting Officer, in order
that the new developments may, at the Government's option, be included
in the equipment being manufactured hereunder. All reports of such
developments shall be addressed to the Contracting Officer. C.5
INTERCHANGEABILITY -- All replaceable parts shall be manufactured to
definite standards, tolerances and clearances in order that any such
parts of a particular type or model can be replaced or adjusted without
modification of the equipment. C.6 MAINTAINABILITY -- The equipment
shall be designed and constructed to permit maintenance personnel to
easily and effectively service the equipment using a minimal number of
tools. Consistent with required maintenance, and design of the
equipment, the contractor shall provide any special tools required to
service the unit. Additionally, the equipment shall be equipped with
access covers to facilitate inspection, cleaning and repair or
replacement of parts. C.7 CONSTRUCTION -- The equipment shall be
constructed of parts which are new, without defects and free of repair.
The equipment shall be complete so that when connected to the specified
utilities it can be used for any operation for which it is being
purchased. The equipment shall be devoid of any defects or
characteristics that will preclude conformance with any of the
requirements under paragraph 3, and inspections and tests under
paragraph 4. C.8 CASTINGS AND FORGINGS -- All castings and forgings
shall be free from defects, scale and mismatching. Processes such as
welding, peening, plugging, or filling with cold solders or metallic
pastes shall not be used on castings or forgings for reclaiming any
parts of the equipment. C.9 WELDING, BRAZING OR SOLDERING -- Welding,
brazing or soldering shall be employed only where those operations are
included in fabrication of the original design. These operations shall
not be employed as repair measures for defective parts. C.10 SURFACES
-- All surfaces of castings, forgings, molded parts, stampings and
welded parts shall be cleaned and free from sand, dirt, fins, sprues,
flux or other harmful or extraneous materials. External surfaces shall
be smooth, and all edges shall be either rounded or beveled unless
sharpness is required to perform a function. C.11 PAINTING -- The
equipment shall be properly painted; painting may be the manufacturer's
standard practice provided it results in a highly wear-resistant finish
which guarantees continued protection to the surfaces covered against
the specified environment under all service conditions. Prior to
painting, surfaces shall be properly prepared and primed.
Manufacturer's standard color shall be provided. C.12 THREADS -- All
threaded parts shall conform to Federal Standard H28. C.13 ALUMINUM
PARTS -- All aluminum parts for use outdoors shall be anodized in
accordance with MIL-A-8625 or chemically treated in accordance with
MIL-C-5541, followed by two coats of weather-resistant exterior paint.
C.14 DISSIMILAR METALS -- Dissimilar metals shall not be used in
direct contact with each other without suitable means for preventing
electrolytic corrosion. C.15 WORKMANSHIP -- Workmanship of the
equipment to be furnished shall be commensurate with the requirements
of this specification and of such quality, which denotes the
performance of skilled and experienced personnel trained in the field
of work performed. WARRANTY: SUPPLIES FURNISHED SHALL BE COVERED BY
WARRANTY FROM DEFECTS IN DESIGN, MATERIALS AND WORKMANSHIP FOR A PERIOD
OF ONE YEAR AFTER DELIVERY OR ACCEPTANCE, WHICHEVER IS THE LATTER. D.
1 PROHIBITED PACKING MATERIALS The use of asbestos or excelsior is
prohibited. In addition, the use of yellow wrapping or packaging
material is prohibited except where used for the containment of
radioactive material. Loose fill polystyrene is prohibited for
shipboard use. E.1 ACCEPTANCE AT DESTINATION -- Final acceptance of the
supplies furnished will be at destination within 45 days after receipt.
Acceptance shall be based upon satisfactory completion of the
examination and tests at destinations; during testing, cognizant
personnel of the receiving activity shall be alert for possible signs
of improper performance, malfunction and potential unreliability. E.2
OPERATIONAL TEST -- The system scaffolding shall be assembled in a
manner and for a time frame suitable to properly demonstrate and verify
the successful operation of the equipment and all of its component
parts, relative to the design, construction and performance criteria
established under Paragraph J, herein. E.3 EXAMINATION AT DESTINATION
-- Examination at destination shall consist of inspection for damage in
shipment, verification of quantities and any visual inspection deemed
necessary by the receiving activity to verify supplies received conform
to the requirements of the specification. F.1 DELIVERY -- Delivery
shall be to Portsmouth Naval Shipyard, Receiving Officer, Portsmouth,
NH 03801-2590, FOB Destination. J.1 ATTACHMENTS: (AVAILABLE BY FAXING
A REQUEST TO 207-438-1251) (a) basic material list (b) diagram for ease
of material ordering J.2 Please provide a system scaffolding using the
basic material list para J.1(a), diagram para J.1(b) and para J.3
specifications. J.3 The following documents of the issue in effect on
date of request for quotation form a part of this specification to the
extent specified herein: Specifications: (1) all pipes, planking and
brackets to be hot dippedgalvanized. (2) ability to deck solid from
upright to upright without wedge interference. (3) 48" stairway kits
with handrails. (4) 12" lockable casters with non-slip surface. (5)
connection point of pipe to upright must be able to be made at any
point within 360 degrees. (6) upright cup spacing to be 19" to 20" to
allow for easy connection to existing units. (7) uprights and
horizontal diameter of pipe to be 1.90" diameter to allow for use with
existing pipe staging clamps at maximum strength and efficiency. (8)
shoring heads that will fit inside of an upright must be able to have
an 8" minimum width. (9) wall thickness of pipe to be .110" and .120".
(10) horizontal ledgers must be able to be purchased in increments of
12" from 1' to 10'. (11) minimum of four upright lengths to choose
from . These must fall within the 1' to 10' range. This allows for
flexibility when staging in confined areas. (a) MILITARY MIL-A-8625
Anodic Coatings for Aluminum and Aluminum Alloys MIL-C-5541 Chemical
Films for Aluminum and Aluminum Alloys (b) FEDERAL STANDARDS
FED-STD-H28 Screw Thread Standards for Federal Service (c) MILITARY
DOD-STD-100C Engineering Drawing Practices (d) OTHER PUBLICATIONS --
The following documents form a part of this specification to the extent
specified herein. Unless otherwise indicated, the issue in effect on
date of request for quotation shall apply: TITLE 29 OF THE CODE OF
FEDERAL REGULATIONS, CHAPTER XVII, PART 1910 -- Occupational Safety and
Health Standards (Application for copies should be addressed to
Superintendent of Documents, Government Printing Office, Washington, DC
20402.) AMERICAN NATIONAL STANDARDS INSTITUTE, INC. (ANSI) (Application
for copies should be addressed to the American National Standards
Institute, Dept. 969, 1430 Broadway, New York, NY 10018.) L.
INSTRUCTIONS TO OFFERORS L.1 REQUIREMENTS FOR TECHNICAL PROPOSALS --
Offerors shall submit, in duplicate, technical proposals written in the
English language. The proposal shall enable government personnel to
make a thorough evaluation and determination as to whether or not the
proposed equipment fully meets the requirements of the statement of
work. To this end, each proposal shall be so specific, detailed and
complete as to demonstrate that the offeror has a thorough knowledge
and understanding of the requirements. Statements that paraphrase the
specifications or attest that "standard procedures will be employed",
etc. are inadequate. Each proposal must be sufficiently adequate to
demonstrate full compliance with the technical requirements of the
statement of work. Failure to comply with these instructions may result
in rejection on an offer. L.2 REQUIREMENTS FOR TECHNICAL EVALUATION
DATA -- In order to substantiate that the services offered are adequate
to meet the requirements specified herein offerors shall submit, as a
minimum, the following: a. Data that demonstrates compliance with the
performance, safety and construction standards of the specifications.
b. Structural, mechanical, and electrical design, and performance
specifications for all major assemblies and subassemblies of the
equipment. c. Scope and schedule of work to accomplish removal and
installation, of equipment d. Description of operation, including
maintenance and trouble-shooting techniques. e. List of customers to
whom representative equipment and services has been previously sold and
points of contact having an intimate knowledge of the equipment. The
above information shall be provided by means of descriptive material
including illustrations, catalog cuts, schematic or engineering
drawings, conceptual explanation or other descriptive literature that
relates specifically to the equipment being offered. Failure to comply
with these instructions may result in rejection of an offer. Posted
04/13/99 (W-SN319800). (0103) Loren Data Corp. http://www.ld.com (SYN# 0501 19990415\54-0001.SOL)
54 - Prefabricated Structures and Scaffolding Index Page
|
|