COMMERCE BUSINESS DAILY ISSUE OF APRIL 20,1999 PSA#2328Contracts Division, Central Puget Sound Regional Transit Authority
(Sound Transit), 1100 Second Avenue, Suite 500, Seattle, WA 98101 Y -- DESIGN/BUILD CONTRACT FOR TUNNELS AND DEEP STATIONS (45TH STREET
STATION TO CAPITAL HILL) SOL RTA/LR 43-99/LB 230 DUE 051499 POC
Willette Rasmussen (206) 689-7445 WEB: Advertisement of RFQ,
http://www.soundtransit.org. E-MAIL: Sound Transit Web Page -- Contract
Opportunities, fernandezr@soundtransit.org. The work for this contract
is primarily the heavy civil construction for the principal structures
listed below. The Design/Build team will be responsible for completing
the design and constructing these structures. The Contractor will be
responsible for selecting the methodology, means and associated
equipment to safely and satisfactorily complete the work. In general,
the principal structures include the following underground workings:
-approximately 13,800 feet of twin running tunnels generally spaced 85
feet apart including a subaqueous crossing approximately 1300 feet in
length; -two deep subterranean transit stations; -a crossover
structure connecting the twin tunnels and located between the transit
stations (the structure is approximately 1100 feet long); -eighteen to
twenty cross passages connecting the twin tunnels spaced at 750 feet;
and -one ventilation shaft and headhouse structure Posted 04/16/99
(W-SN321456). (0106) Loren Data Corp. http://www.ld.com (SYN# 0112 19990420\Y-0002.SOL)