|
COMMERCE BUSINESS DAILY ISSUE OF APRIL 21,1999 PSA#2329U.S. Army Corps Of Engineers, Fort Worth District, P.O. Box 17300, 819
Taylor Street, Attn: CESWF-CT, Fort Worth, TX 76102-0300 Y -- BASE OPERATIONS AND TOWER COMPLEX, LAUGHLIN AFB, TX SOL
DACA63-99-B-0038 DUE 080499 POC Contract Specialist, Tongee Flemming,
(817) 978-3391 WEB: U S Army Corps of Engineers, Ft Worth District,
http://ebs.swf.usace.army.mil. E-MAIL: U S Army Corps of Engineers,
Fort Worth District, tongee.d.flemming@swf02.usace.army.mil. Work
constists of two (2) buildings -- Control Tower, approximately 100'
tall with an enormous amount of communication conduit and cabling, and
the construction of a glass walled tower cab at the top of the
structure; and a Base Operations building which houses the weather
radar's and air traffic controllers with their radar equipment, which
must have interruptible power supplied to each building. Includes all
turfing and landscaping for the Base Operations Facility and the New
Aircraft Control Tower. Option 1) Demolition of existing Aircraft
Control Tower; Option 2) Provide entrance canopy at the Base Operations
Building; Option 3)Provide a new Marquee Sign for the Base Operations
Building; Option 4) Demolition of Building 307; Option 5) Demolition of
Building 301 and expansion of parking area; and Option 6) Overlay and
restripe existing parking area. THIS IS AN UNRESTRICTED REQUIREMENT.
Bids from LARGE BUSINESS FIRMS must comply with FAR Clause 52.219-9
regarding the requirement for submission of a subcontracting plan.
ESTIMATED COST RANGE: Between $5M and $10M. SIC Code is 1542, and the
SBSS $17M. Fort Worth District subcontracting goals are for specified
percentages of the Contractor's total planned subcontracted amount to
be placed with the following: SMALL BUSINESS-61.2%; small disadvantaged
business-9.1%; WOMEN-OWNED SMALL BUSINESS-4.5%; and HBCU/MI- 9.4%. The
Government intends to issue this solicitation through the use of CD
ROM and the Internet. However, the Government reserves the right to use
only the Internet as notification of any changes to this solicitation.
Contractors may view/download this solicitation and all amendments on
the Internet after solicitation issuance at the following Internet
Address: http://ebs.swf.usace.army.mil. Bidders should register
themselves on the Internet to recieve a copy of this solicitation (CD
ROM). NO EXPRESS MAIL PROCEDURES WILL BE UTILIZED ON INITIAL MAILING OF
THE CD. ALL RESPONSIBLE SOURCES MAY SUBMIT A BID WHICH WILL BE
CONSIDERED BY THIS AGENCY. Posted 04/19/99 (W-SN321688). (0109) Loren Data Corp. http://www.ld.com (SYN# 0106 19990421\Y-0010.SOL)
Y - Construction of Structures and Facilities Index Page
|
|