COMMERCE BUSINESS DAILY ISSUE OF APRIL 26,1999 PSA#2332Defense Energy Support Center, 8725 John J. Kingman Rd., Suite 4950, Ft
Belvoir, VA 22060-6222 S -- SOURCES SOUGHT FOR PRIVATIZATION OF U.S. ARMY UTILITY SYSTEMS FOR
C.E. KELLY SUPPORT FACILITY & ANNEXES, OAKDALE, PENNSYLVANIA
15071-5000. POC Mary Harding, Contract Specialist @ (703)767-9653, Mary
Jo Fehr, Contract Specialist @(703)767-8537 or Elizabeth Pesenti,
Contracting Officer @(703)767-8130 E-MAIL: Click here to contact the
cognizant Contracting Office, mfehr@desc.dla.mil, epesenti@desc.dla.mil
or mharding@desc.dla.mil. DESC: The Defense Energy Support Center
(DESC), in conjunction with the US Army Assistant Chief of Staff for
Installation Management (ACSIM) and the United States Army Reserve
Command, seeks to identify responsible potential sources and obtain
information in regards to privatization of utility systems in
accordance with 10 USC 2688, "Utility Systems: Conveyance Authority"
for the US Army Reserve Center located in the State of Pennsylvania to
include: C.E. Kelly Main Post located in Oakdale, Pennsylvania; Site
62 which is 1.5 miles from the main post; Site 63 which is 3 miles from
the main post; and Neville Island which is 15 miles form main post. The
potential privatization actions will include transfer of ownership,
operation and maintenance, and the obligation to serve. The Army
intends to retain ownership of all land and will grant easements and
leases for access to land associated with each utility system.
OBJECTIVE: Should privatization occur, the ownership of the entire
utility plant and equipment to include all capital investments,
operation, maintenance and repair responsibilities, shall transfer to
a publicly or privately owned utility provider. All responsibility for
maintaining reliable service, including such items as environmental
compliance, operation, maintenance, major systems renovation,
construction, equipment, manpower and overhead shall be the
responsibility of the utility provider. INSTALLATION AND UTILITY
SYSTEMS DESCRIPTIONS: Location: Charles E. Kelly Support Facility and
Annexes, Oakdale, PA Description of Facilities: The CE Kelly Support
Facility and Annexes consists of 52 permanent buildings and is divided
into four separate areas as follows: a. CE Kelly Main Post: --
Electric Distribution: Power Supplied to base by Duquesne Light Co;
Overhead Electrical Lines (55,908 Linear Feet); Substation (4150 KV);
Exterior Lighting (23,255 Linear Feet). -- Natural Gas Distribution
System: Natural Gas Supplied to base by Equitable Gas Co; Gas Pipelines
( 2,260 Linear Feet). -- Water Distribution System (No Treat Plant):
Purchased Water Supplied by Penn American Water Co.; Water Distribution
System (14,356 Linear Feet); Water Pump Station (54 KG); Water Storage
Tank (125,000 Gallons); Water Storage Tank (210,000 Gallons). --
Wastewater Collection System (No Prim Treat Plant): Purchased Sewer
Treatment Service from Collier Township; Sanitary Sewer (12,536 Linear
Feet); Sewer Lift Station (8 KG); Secondary Treatment Plant (80 KG);
Secondary Treatment Plant (8 KG) b. Site 62 (Located 1.5 miles from
Main Post): -- Electric Distribution System: Power Supplied from
Duquesne Light Co; Overhead Electrical Lines (10 Linear Feet); Exterior
Lighting (10 Linear Feet). -- Natural Gas Distribution System -- No
Gas. -- Water Distribution System (No Treat Plant): Water Supplied by
Penn American Water Co.; Water Distribution System (11,171 Linear
Feet). -- Wastewater Collection System (No Treatment Plant); Purchased
Sewer Treatment Service from Collier Township; Sanitary Sewer (3,856
Linear Feet). c. Site 63 -- (Located 3 Miles from Main Post): --
Electric Distribution System: Power Supplier by Allegheny Power;
Overhead Electrical Lines (6,286 Linear Feet); Exterior Lighting (2,950
Linear Feet). -- Natural Gas Distribution System -- No Gas. -- Water
Distribution System (No Treatment Plant); Water Supplier: Penn Water
Co.; Water Distribution System (11,170 Linear Feet). -- Wastewater
Collection System with (Small Package Treatment Plant);Army Owned
Treatment Plant; Sanitary Sewer (3,856 Linear Feet); Sewer Lift Station
(3.6 KG); Secondary Treatment Plant (1.0 KG); Septic Tank & Drain
Fields (2.6 KG) d. Neville Island -- (Located 15 Miles from Main Post)
-- Electric Distribution System: Power Supplied by Duquesne Light Co;
Overhead Electrical Lines (867 Linear Feet); Exterior Lighting (867
Linear Feet) -- Natural Gas Distribution System: Natural Gas Supplied
by Columbia Gas of Pa; Natural Gas Pipelines (424 Linear Feet). --
Water Distribution System(No Treatment Plant): Purchased Water from
Neville Township; Water Distribution System (150 Linear Feet). --
Wastewater Collection System (No Treatment Plant): Purchase Sewer
Treatment Serviced by Neville Township; Sanitary Sewer (75 Linear
Feet). PROCESS: This request is to gather information from interested
parties and is an essential step in determining market interest for the
privatization of the utility systems at the affected installations. In
order to minimize costs, both to potentially interested parties and
the government, this notice is issued to determine market interest and
feasibility as well as determining marketing strategies for
privatizing utility systems. Interested parties should provide a
statement of interest on company letterhead. The statement of interest
must not exceed a total length of 15 pages, plus 1 page per type of
utility system of interest. Parties may express interest in a range of
ownership possibilities, from a single utility system to interest in
all utilities at all bases. The statement shall include, as a minimum,
the following information: (1) capability and experience in the
ownership, operation and maintenance of similar systems; (2) financial
capability to purchase, upgrade, expand, operate and maintain utility
systems; (3) specific utility system(s) of interest and desired
bundling of utilities to purchase; (4) conceptual rate plan (i.e., will
charges for utility service be made from existing rates or from rates
developed specifically for service at the individual installation(s);
(5) discussion of your conceptual basis for a proposed purchase price
(capitalized earnings value, replacement cost new less depreciation,
original cost less depreciation, or other); (6) understanding of any
applicable state or local utility laws or franchise requirements, and
capability of complying with such requirements; (7) understanding of
the federal, state and local environmental laws and regulations and
familiarity and experience with environmental compliance procedures and
regulations for the applicable states and US Environmental Protection
Agency Regions. SITE VISIT AND DATA: Neither a site visit nor the
provision of additional data on the utility systems is considered
necessary for the preparation and submittal of statement of interest.
If a site visit and the provision of additional data are later
determined necessary, notification will be provided by way of an
amendment to this announcement. DUE DATE: Statements of interest must
be submitted to the Defense Energy Support Center (Code DESC-APP) by
3:00 PM Eastern Standard Time on 24 May 1999. Sources may respond by
mail to: Defense Energy Support Center, 8725 John J. Kingman Road,
Suite 4950, Attn: Mary Jo Fehr, DESC-APP, Room 3838 Ft. Belvoir, VA
22060-6222. Or, you may email your responses to the following email
addresses: mharding@desc.dla.mil or mfehr@desc.dla.mil or
epesenti@desc.dla.mil. Posted 04/22/99 (W-SN323453). (0112) Loren Data Corp. http://www.ld.com (SYN# 0075 19990426\S-0010.SOL)
S - Utilities and Housekeeping Services Index Page
|
|