Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF APRIL 27,1999 PSA#2333

Commander, Naval Air Systems Command (Code 2.3), Patuxent Naval Air Station, Bldg 2272, Lexington Park, MD 20670

L -- DESIGN, PRODUCTION AND INSTALLATION OF SERVICE LIFE EXTENSION PROGRAM (SLEP)KITS FOR THE H-53E SOL n/a POC Mr. Jude J. Landrum, 301-757-5242, AIR-2.3.2.3.1 WEB: none, none. E-MAIL: E-MAIL: LANDRUMJJ@NAVAIR.NAVY.MIL, E-MAIL: LANDRUMJJ@NAVAIR.NAVY.MIL. The Naval Air Systems Command (NAVAIR) is seeking capable sources interested in the following activities which may be incorporated into a single contract. Based on the schedule contained herein NAVAIR encourages the use of teaming among various sources in order to allow the maximum participation in performing the below listed requirements. 1. Development, production and installation of one MH-53E validation/verification (val/ver) kit in FY00 and a CH-53E val/ver kit in FY03. Each kit will include the building of the appropriate model H-53E main cabin section from station 162 to station 522, wiring bundles that reflect the current production configuration which will include 14 additional government introduced engineering changes and Rapid Action Minor Engineering Change (RAMECs) for the entire aircraft, and an H-53E tail section from station 773 to station 950 less the stabilizer. Additionally an airframe transition side bulkhead at station 772 is required. Tailrotor dri9veshaft and disconnect coupling improvements as detailed in the Engineering Change Proposal (ECP) SA-H-53 2181/2671 will be considered part of the SLEP kit. The Government is in possession of a Level III engineering drawing package for the basic production H-53E model helicopter. However, the existing H-53E data resides in several deliverable media forms, including circa 1975 paper format drawings. In addition to the basic drawing package, technical information, in assorted media forms, will be provided which outlines chronologically the engineering changes and RAMECs which have been incorporated into the basic airframe configuration. Offerors in responding to this solicitation must possess the ability to read and interpret the delivered information, as well as capture and incorporate all outstanding Class I and II engineering changes and RAMECs into the basic drawing package. This data will be provided in its current format to the contractor selected. At the time of delivery of the kit, the chosen contractor shall deliver to the Government a digitized H-53E Level III drawing package, including any information necessary to build and install the kits, which must be in an editable format and representative of the desired H-53E SLEP configured aircraft. Any changes required to be made to the kits and/or drawing package as a result of the H-53E SLEP val/ver process, will be incorporated by the contractor at no increase in the contract price. Additionally a technical directive (TD) for the installation of the SLEP kits will be a required deliverable product based on the val/ver kit completion. All government owned special tooling and test equipment currently positioned at Sikorsky Aircraft Corp. and its sub-contractors' facilities will be made available to the contractor selected to perform the SLEP. Although the list of tooling and test equipment is not yet fully developed, it is known that some equipment, needed to perform the SLEP, is not government owned. It will be the responsibility of the selected contractor to supply any additional required tooling and equipment. In addition to the stated requirements for the val/ver kits effort, contractors must have the technical expertise, requisite special tooling and support equipment to accomplish all of the aircraft cabin wiring and hydraulic plumbing interfaces and operating requirements. Source data for the aircraft hydraulic lines (tubing bend information) will be provided by the Government, however, special tooling, data interpretation and proper line to line fit and operation will be the responsibility of the contractor selected. 2. Production of SLEP kits that meet the configuration of the Government verified SLEP kits commencing in FY01 and continuing until FY04 in accordance with the schedule shown below: FY00 FY01 FY02 FY03 FY04 0 1 0 7 11 3. Installation of the SLEP kits shall be in accordance with the following schedule: FY00 FY01 FY02 FY03 FY04 0 0 1 0 7 4. Perform SDLM in accordance with the most current NAVAIR H-53E SDLM Specification concurrent with the SLEP installation schedule. All respondents to this sources sought must detail, in writing, their capability to perform all of the requirements within the stated schedule outlined above. Said detail must include prior history in the performance of similar or related requirements and describe facilities that have been previously used on similar efforts or those that would be used in manufacturing and installing the SLEP kits and performing SDLM. In addition provide a brief synopsis of the contractor's anticipated engineering, logistic and support plans that would be used throughout this effort. This synopsis supercedes CBD#231969 dated 31 July 1998. Responses are requested from all interested parties whether or not they responded to the earlier synopsis. Written responses are required no later than 26 May 1999. Posted 04/23/99 (W-SN323811). (0113)

Loren Data Corp. http://www.ld.com (SYN# 0045 19990427\L-0001.SOL)


L - Technical Representative Services Index Page