|
COMMERCE BUSINESS DAILY ISSUE OF MAY 3,1999 PSA#2337USDA -- Wenatchee National Forest, Procurement and Property Management,
215 Melody Lane, Wenatchee, WA 98801 Y -- 5 CAMPGROUND CONSTRUCTION AND RECONSTRUCTION, NACHES RANGER
DISTRICT, WENATCHEE NATIONAL FOREST, YAKIMA COUNTY, WASHINGTON SOL RFP
R6-17-99-30 DUE 070199 POC Rosie McDonald, 509/664-2715 The projects
are located along the Chinook Pass Highway (SR410) heading west from
Naches, WA. Additional directions to each site can be obtained by
calling Larry Miller at (509) 653-2205. Project calls for the
construction and reconstruction of 3-5 campgrounds (depending on
availability of funds). Work will include: clearing and grubbing,
excavation, borrow, asphalt and aggregate surfacing of road and camp
spurs and trails, well pump modification; installation of Government
furnished (GFP) vault toilets, wood (GFP) and rock barriers, picnic
tables (GFP), fireplaces (GFP), signs (GFP), precast curbs, concrete
pads, streamside wood steps, planting of shrubs and trees (GFP),
riprap, and log bank stabilization. Performance and payment bonds
required. Project estimate is between $500,000.00 and 1 million
dollars. Start work is estimated to be 08/01/99 with 120 calendar days
for contract time. Hydraulic Permit Approval will limit time and type
work to be done instream. Solicitation package should be available
06/01/99. Posted 04/29/99 (W-SN326092). (0119) Loren Data Corp. http://www.ld.com (SYN# 0114 19990503\Y-0001.SOL)
Y - Construction of Structures and Facilities Index Page
|
|