|
COMMERCE BUSINESS DAILY ISSUE OF MAY 7,1999 PSA#2341Commander, Naval Air Systems Command (Code 2.2), 47123 Buse Road, Bldg
2272, Patuxent River, MD 20670-1547 A -- F120 ENGINE INTEGRATION AND ENGINE INTERCHANGEABILITY STUDIES POC
Pam Valovcin, ValovcinPM@jast.mil; Kathy Cooper, CooperK@jast.mil WEB:
Joint Strike Fighter Home Page, http://www.jast.mil. E-MAIL:
http://www.jast.mil, http://www.jast.mil. The Joint Strike Fighter
(JSF) Program office intends to modify the JSF Concept Development
Program Contracts Nos. N00019-97-C-0037 and N00019-97-C-0038, which
were competetively awarded to The Boeing Company, Information, Space &
Defense Systems, P.O. Box 3707, Mail Stop 4C-80, Seattle, WA
98124-2207 and Lockheed Martin Corporation, Tactical Aircraft Systems,
P.O. Box 748, Fort Worth, TX 76101, respectively. These modifications
are necessary in order to facilitate the defining and reconciliation
of the Preferred Weapon System Concept (PWSC) propulsion system, the
EMD development program, and the EMD business approach. Specifically,
these modifications will define how the P&W F119 and the GEAE F120
engines will be developed to seamlessly interface with a set of common
lift and exhaust system components and support system. The JSF
contractors are the only responsible sources capable of supporting this
requirement. Any programmatic questions should be addressed to Major
Paul Waugh at WaughPC@jast.mil. Contractual questions should be
addressed to Ms. Pam Valovcin at ValovcinPM@jast.mil or Ms. Kathy
Cooper at CooperK@jast.mil. See Note 22. NAVAIR Synopsis No. 20108-99
Posted 04/28/99 (W-SN325222). (0118) Loren Data Corp. http://www.ld.com (SYN# 0003 19990507\A-0003.SOL)
A - Research and Development Index Page
|
|