|
COMMERCE BUSINESS DAILY ISSUE OF MAY 10,1999 PSA#2342Commander, Naval Air Systems Command (Code 2.2), 47123 Buse Road, Bldg
2272, Patuxent River, MD 20670-1547 16 -- EA-6B UPGRADE KITS AND INSTALLATIONS POC Contact: Joanne Fuesel
(301) 757-7061 E-MAIL: fueselJB@navair.navy.mil,
fueselJB@navair.navy.mil. This synopsis amends synopsis #20019-99
issued on or around 24 November 1998, to include Scheduled Depot Level
Maintenance (SDLM) requirements and, to incorporate the requirements
identified in synopsis #20050-99 issued on or around 14 January 1999.
The original synopses comprised Naval Air Systems Command requirements
to purchase upgrade kits and installation for modification of Block 82
and Block 89 EA-6B aircraft to the Block 89A configuration. The
requirements included engineering and logistics effort to provide for
modification, manufacturing and installation of the upgrade kits in
addition to any interim spare and repair parts required. The upgrade
will result in the incorporation of common avionics non-development
items into the aircraft (ARC-210 radio, embedded global positioning
system/inertial navigation system and the integration of an existing
high speed integrated circuit card into the AYK-14 computer). This
synopsis revises the retrofit requirement from approximately 12 upgrade
kits to modify Block 82 aircraft to the Block 89A configuration to
approximately 15 upgrade kits for modification of the Block 82 aircraft
to the Block 89A configuration. A new requirement to perform SDLMs on
approximately 44 aircraft is being added to the proposed contract
requirement, in addition to provisioned line items for
repair-incident-to-modification (RIM) and installation of government
furnished kits (AFCs) should they be required. Included in the original
synopsis and still planned to be procured are: approximately 8 kits for
modifying Block 89 aircraft to the 89A configuration; installation of
approximately 6 Block 82-89A kits (4 stand alone, 2 concurrently with
SDLM); and installation of approximately 5 Block 89-89A kits (4 stand
alone, 1 concurrently with SDLM). The Government intends to negotiate
a firm fixed price contract with Northrop Grumman Corporation (NGC),
Bethpage, NY pursuant to Title 10 U.S.C. 2304(c)(1), only one
responsible source. NGC is the sole designer, developer, and
manufacturer of theEA-6B airframe, and as such is the only known source
with the engineering expertise, source data, facilities and knowledge
to provide the required effort. This synopsis is for informational
purposes only. Inquiries regarding the availability of subcontracting
opportunities should be directed to Northrop Grumman, South Oyster Bay
Road, Bethpage, NY 11714. See note No. 22 ***** Posted 05/06/99
(W-SN328494). (0126) Loren Data Corp. http://www.ld.com (SYN# 0170 19990510\16-0014.SOL)
16 - Aircraft Components and Accessories Index Page
|
|