COMMERCE BUSINESS DAILY ISSUE OF MAY 11,1999 PSA#23435460 South Quebec St., Suite 100, Englewood, CO 80111-1916 E -- PRIVATIZATION UNDER 10 USC 2688, UTILITY SYSTEMS: CONVEYANCE
AUTHORITY AT THOMPSON FIELD, MISSISSIPPI ANG, JACKSON, MS. DUE 062599
POC Scott Beckman or Joel Theis, 303/771-3103 E-MAIL: Email to POC,
sbeckman@talpart.com. The Air Force seeks to identify responsible
potential sources and obtain information in regards to privatization of
utility systems in accordance with 10 USC 2688, "Utility Systems:
Conveyance Authority". The Commander of Thompson Field, Air National
Guard installation (ANG) is seeking interest and information
specifically for the potential privatization of the electrical system
at Thompson Field, Mississippi. OBJECTIVE: Should privatization result,
the ownership of the Thompson Field electrical system, operation and
maintenance and obligation to continue to provide utility service for
an indefinite and ongoing period will transfer to a utility service
provider. All responsibility for maintaining reliable utility service,
including such items as environmental compliance, maintenance costs,
major system renovations, construction, equipment, manpower and
overhead costs will become the utility service provider's
responsibility. It is intended that the privatization will ultimately
reduce the Air Force's life-cycle costs for operating and maintaining
utility systems and services. SYSTEM DESCRIPTIONS: The following is
provided only to give an approximation of the size, scope and general
description of the electrical utility system. Any numbers should only
be used for estimating purposes. The following system parameters are
approximations: The base size is about 97.4 Acres. This includes 33
buildings. Electrical Distribution: 13,800 Volt Distribution System (No
substations; 1 primary feed from utility). Approximate Annual
Consumption: 4,704,963 kWh. Primary Distribution: 2,762 Feet. Secondary
Distribution: 2,068 Feet. Majority of system installed in 1984.
PROCEDURES: This request to interested parties is for gathering
information and is a required component of a systematic process to
evaluate the interested parties under the Air Force's utilities
privatization program. In order to minimize costs both to potentially
interested parties and the government, this notice is being issued to
determine the interest and feasibility of proceeding with a formal
request for proposals. Should insufficient credible interest be
identified for a privatization action, it is highly likely that no
formal solicitation will be issued. SHOULD INTEREST BE DETERMINED
SUFFICIENT, A FORMAL REQUEST FOR PROPOSALS MAY BE FORTHCOMING. Small
Business interests shall note the FAR Part 19 Standard Industrial Codes
(SIC) and Size Standards for the utility systems identified in this
announcement. Some, all, or any combination of the following may apply.
SIC/SS: 4911/4Million (M) Megawatt hours, 4922/$5M, 4923/$5M, 4924/500,
4925/$5M, 4931/$5M, 4932/$5M, 4939/$5M, 4941/$5M, 4952/$5M, 4953/$6M,
4959/$5M, 4961/$9M, 4971/$5M. REQUESTED RESPONSE: Interested parties
should provide a statement of interest on company letterhead (not to
exceed 20 pages in length). The statement should include as a minimum
the following criteria: (1) capability and experience in ownership,
operation and maintenance of similar utility systems, (2) financial
capacity to purchase, expand and operate the utility systems; (3)
statement detailing the understanding of the obligation to serve in
regards to continuous utility service; (4) statement detailing the
legal right to serve, own, operate, and maintain utility systems within
state laws and an understanding of any applicable federal, territorial
and local utility laws, regulations or franchise requirements
affecting utilities in the territory, and capability of complying with
such requirements; and (5) statement detailing the understanding of
federal, territorial, and local environmental laws and regulations and
familiarity and experience with environmental compliance procedures
and regulations for the State of Mississippi and the U. S.
Environmental Protection Agency. Elaborate proposals or pricing
information is neither required nor desired. Under no circumstances
will cost data for the existing systems be provided. Any innovative and
new conceptual ideas to achieve the stated objective are encouraged. If
a site visit and the provision of additional data are later determined
necessary, notification will be provided by way of an amendment to
this announcement. It should be noted that RFIs for different utility
systems may be issued in the same time frame. A separate response to
each RFI is required. Posted 05/07/99 (W-SN329220). (0127) Loren Data Corp. http://www.ld.com (SYN# 0032 19990511\E-0002.SOL)
E - Purchase of Structures and Facilities Index Page
|
|