Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MAY 17,1999 PSA#2347

U.S. Army Tank-Automotive and Armaments Command, Acquisition Center (AMSTA-AQ-DE), Warren, MI 48397-5000

Y -- RENOVATION OF BUILDING 835 AT SELFRIDGE ANGB LOCATED IN MT. CLEMENS, MICHIGAN SOL DAAE07-99-Q-Q027 DUE 052699 POC Carol Paton (810) 574-5081 or (810) 307-4389 Renovation of Bldg. 835 to accommodate the MCSS relocation IAW Vision 2000 requirements. SITE VISIT: May 18, 1999 at 1:30 p.m. Contact: Carol Paton (810 574-5081 or (810) 307-4389. STATEMENT OF WORK: GENERAL: This contractor shall provide all labor, material, tools, equipment and supervision necessary to renovate building #835 (MCSS) in accordance with attached design, specifications, notes therein and all attached and referenced documents. All work to be performed at the Selfridge ANGB located east of Mt. Clemens, MI. SCOPE: All work shall be performed in accordance with design and specifications, requirements noted herein, related documents and attachments and applicable federal, state and local codes and regulations and shall be performed in a manner consistent with the standard practices of the industry and trades involved. Should a conflict exist between standard practice and codes or regulations, the code and/or regulation shall prevail. Work shall include, but not necessarily be limited to: Demolition: Masonry and gypsum board wall removal; Framed ceiling, suspended ceiling removal and removal of asbestos composition floor tile; Removal and disposal of all related debris. Construction, (furnish and install complete, unless otherwise noted): Gypsum board walls and door openings; Lay-in lighting fixtures and related electrical work, (per dwg. Spec.); Replacement of suspended ceiling, acoustical tile and cleaning of existing metal grid ; Option "A" -- Replacement of acoustical ceiling tile AND metal grid, complete; Four roof mounted cooling units complete with roof supports, openings and patching, as required, (units as specified or equal); Emergency and exit lighting with battery back-up; INSTALL ONLY, customer furnished vinyl composition floor tile and carpeting; Doors, complete with framing and all required hardware; Interior painting of Retail Sales store area walls; Electrical circuits, wire, conduit, disconnects, JB's, etc. to serve cooling units and additional light fixtures; Janitorial electrical receptacles and circuit at 20 LF intervals around the perimeter of the Retail Sales space, (14 (+/-) req'd); Heat detectors and extension of fire alarm system, as required. (all alarm work must be coordinated with the Base Fire Dept. 307-4363 and the adjacent occupant); Add silent electronic "duress" alarm system with signal to the Police Station Control Room, B#300. (communication wiring by "others"); Relocate existing Fire Alarm, Annunciator panel. (Simple remount to adjacent wall req'd!). Preliminary Survey: Confirmation of existing electrical distribution panel capacity and its' ability to support cooling units and other loads, as required; Identification of electrical panel currently supporting the existing lighting systems and capacity to support fifty additional fixtures, (4-32w lamps /fixt.). REFERENCE DRAWINGS & SPECS: Reference drawings and specifications consist of: (1) This Statement of Work; (2) One Construction drawing and notes, sht. 1 of 3; (3) One combination HVAC and Fire Protection drawing and notes, sht. 2 of 3; (4) One Demolition titled drawing and notes, sht. 3 of 3. IMPLEMENTATION OF WORK: The work site must be maintained in a neat and orderly fashion at all times, broom swept or equivalent at the end of each workday. All hand tools must be assembled and stored in a locked container or removed from the site, at the contractors' discretion. All materials must be neatly stored in a suitable, customer designated area accessible to the work site. Materials subject to damage by inclement weather shall be covered, or otherwise protected, as required. The interior work site may be utilized for material storage if properly protected from damage. Materials remain the property of the contractor until installed and accepted at close of the contract. The contractor shall provide a dumpster to collect and transport demolition and/or construction debris, as required. The customers dumpsters may not be utilized without the specific consent of the COR. The work site is to be available NLT 1 June 1999. All work must be complete (including punch list correctional items), system tryout, etc., NLT 13 Sept. 1999. The contractor shall submit a written schedule of anticipated construction activities and milestones within seven work days of order receipt. The schedule shall indicate proposed "Start" and "Completion" dates and include; demolition, wall erection, lighting and ceiling work, A/C unit installation, electrical, etc. EXISTING CONDITIONS: The contractor shall visit the site to observe and confirm existing conditions prior to submitting cost proposal. Failure to recognize visible conditions and interference that subsequently impact costs, may not be considered for a contract cost increase. Subject work addresses one building and two occupancies. The contractor shall proceed with caution during any utility disconnect as the utility may service the second occupant, as well. Therefore, prior to any disconnect or utility shut-down the contractor must coordinate activity with the adjoining occupant. PROPOSAL: The contractor shall submit a base cost proposal in accordance with the original RFP. Suggestions, alternate designs and/or exceptions to the design or specification must be identified, fully described, cost estimated and submitted with the contractor's RFP compliant proposal. Optional costs must be identified as such and must be presented as An "add or deduct" to the base bid. Posted 05/13/99 (W-SN331153). (0133)

Loren Data Corp. http://www.ld.com (SYN# 0134 19990517\Y-0002.SOL)


Y - Construction of Structures and Facilities Index Page