|
COMMERCE BUSINESS DAILY ISSUE OF MAY 17,1999 PSA#2347Facilities Service Offcice, 4000 DeKalb Technology Pkwy., Ste. 300,
Atlanta, GA 30340-2799 Z -- PREQUALIFICATION FOR REPAIRS & ALTERATIONS FOR THE SUNCOAST
DISTRICT SOL 123125-99-A-PQ01 DUE 061499 POC Leslie L. Martin, (770)
454-0660 E-MAIL: Leslie Martin, (770) 454-0660,
lmartin7@email.usps.gov. This is a notice of our intent to prequalify
General Contractors for repair and alterations at Postal Facilities in
various locations in the Suncoast District. Locations and exact
numbers have not yet been determined. Primary factors will be
considered are: construction experience, financial stability, and
capacity. Applications will be evaluated by the USPS committee, and all
General Contractor's will be advised within 60 days of receipt of their
application as to prequalifications status. General Contractor's
selected as being the most qualified will be placed on the
prequalification list. The prequalified list will be established for
24-months beginning on the day following the day the list is
established. At the end of one year, the Postal Service will consider
evaluating additional firms for prequalification. The projects will
typically involve interior renovations work with only minor
modifications, if any, to the building exterior and parking areas.
Exterior and interior signage installation is included. The
construction will require close coordination with the postal facility
which may be occupied and operational. Coordination will also be
required with the USPS Facilities Service Office and other USPS
representatives. The construction contractor must provide all labor,
material, equipment, services, permits, taxes and insurance necessary
to complete the work as well as phasing their operation to minimize
disruptions to postal operations. The typical trades involved are:
drywall, flooring, ceiling, carpentry, finishes, electrical, security,
mechanical and fire protections. Modifications to existing piping,
equipment, devices and services are anticipated. The contractor may
also coordinate, order, receive and install certain USPS furnished
materials and equipments. COST RANGE: The anticipated construction cost
for an individual project is expected to range from $100,000 to
$1,000,000 per location. Interested General Contractors that meet the
minimum criteria stated above may obtain a Contractor Prequalification
Statement by contacting Leslie Martin, Facilities Contract Specialist,
by calling (770) 454-0660 (and leave your name and address if you reach
voice mail) or faxing a request to (770) 454-0679. Contractor
Prequalification Statements will not be returned. Only this package
will be considered in compliance with this solicitations and all others
will be rejected. Posted 05/13/99 (W-SN331001). (0133) Loren Data Corp. http://www.ld.com (SYN# 0190 19990517\Z-0037.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|