COMMERCE BUSINESS DAILY ISSUE OF MAY 20,1999 PSA#2350Eldorado National Forest, 100 Forni Road, Placerville, CA 95667 Y -- PACIFIC TURNBACKS -- ROAD CONSTRUCTION SOL RFP-R5-03-99-39 DUE
070899 POC Kathryn M. Griffin, CO, 530/622-5061x5295, or Larry Taylor,
COR, 530/622-5061 WEB: RFP-R5-03-99-39 Pacific Turnbacks -- Road
Construction, www.clarint.com/tnf. E-MAIL: RFP-R5-03-99-39 Pacific
Turnbacks -- Road Construction, acquisitions/r5_eldorado@fs.fed.us.
Project consists of approximately 9.03 miles of forest road
reconstruction, and 1.23 miles of new road construction. Major items of
work include clearing and grubbing, excavation, placement of 2740 tons
of aggregate base, reconditioning of roadbed, seeding and mulching,
removal of trees, installing drainage ditches, graded dips, swales,
channel excavation, lead off ditches, catch basins, inlet basins,
waterbars, steel barricade, placement of concrete sacked riprap, and
corrugated metal pipes. Estimated price range is $100,000 to $250,000.
There will be no pre-bid tour or meeting. Work to start approximately
August 9, 1999. Project is broken into to separate areas: To reach
area (1) from Placerville, travel east 25 miles on US Route 50 to
Riverton. Then travel 14 miles north on Ice-House Road (17N12) to the
Peavine Ridge Road (11N55) intersection. Then follow the location map
to each individual road. To reach area (2) from Placerville, travel
east 25 miles on US Route 50 to Riverton. Then travel 23 miles north on
Ice-House Road (17N12) to the Sourth Fork Road (13N28)intersection, and
24 miles to the Loon Lake Road (14N01) intersection. Then follow the
location map to each individual road. Solicitation package to be
available approximately June 8, 1999. To request solicitation package,
please place request via web site, email, or via fax (530) 621-5258.
Posted 05/18/99 (W-SN332751). (0138) Loren Data Corp. http://www.ld.com (SYN# 0111 19990520\Y-0005.SOL)