COMMERCE BUSINESS DAILY ISSUE OF MAY 25,1999 PSA#2353National Institute of Standards & Technology, Acquisition & Assistance
Div.,100 Bureau Drive Stop 3572, Bldg. 301, Rm B117, Gaithersburg, MD
20899-3572 Z -- CONTINUATION OF INSTALLATION OF THE NIST SITEWIDE ALARM SYSTEM
SOL 50SBNB5C8663 POC Joan M. Smith (301) 975-6458 WEB: NIST Contracts
Homepage, http://www.nist.gov/admin/od/contract/contract.htm. E-MAIL:
NIST Contracts Office, Contract@nist.gov. In August 1995, the National
Institute of Standards and Technology (NIST), Gaithersburg, Maryland
awarded a contract to SP Contracting, Inc., 10545 Guilford Road,
Jessup, Maryland, for the installation of a sitewide alarm system. That
system replaces the fire, security, and mechanical/electrical alarm
systems. The NIST site has approximately 35 buildings on its 232
hectare site (560 acres). Most of the buildings are connected by an
existing manhole-duct bank system and the alarm system connections
between the buildings are required to be fiber optic cable run in the
duct bank system. Some new duct bank was required to be installed under
the contract. The building panels are required to be connected in a
token ring arrangement and will operate on an equal priority, with no
master or controlling panel. When the new system becomes operational,
the old system will be removed. Since the site is occupied during
construction and the old system is required to be functional until
acceptance of the new system. As the contract has progressed it was
determined that the methodology to achieve the scope of work was
modified to include a complete replacement of the site alarm system,
including all upgrades, as opposed to the original intent of only a
select component replacement. Some of the components include, but are
not limited to, the requirement for many more sensors/detectors than
originally anticipated plus many more upgrades. To date approximately
one-third of the buildings at NIST have been completed and are being
tested. It is NIST's intention to continue the procurement with SP
Contracting and modify their contract for additional work since they
are responsible for the total site installation, and are liable for the
operation of the new Simplex alarm system. They are intimately familiar
with NIST, eliminating the learning curve. The magnitude of
construction for this continuation of work is $1M -- $5M. See Numbered
Note 22 and 26. Posted 05/21/99 (W-SN334454). (0141) Loren Data Corp. http://www.ld.com (SYN# 0103 19990525\Z-0016.SOL)