COMMERCE BUSINESS DAILY ISSUE OF MAY 28,1999 PSA#2356Saint Lawrence Seaway Development Corporation, P.O. Box 520, Massena,
New York 13662-0520 J -- MODIFICATION TO CBD ANNOUNCEMENT 327389 -- DRYDOCKING THE
CORPORATION'S TUG, ROBINSON BAY SOL DTSL55-99-Q-P0526 DUE 070799 POC
Pat White, Contract Specialist, 315-764-3236/Linda M. Harding,
Contracting Officer, 315-764-3244 This is a modification to the
synopsis issued as RFQ DTSL55-99-Q-P0526 published 05/06/99. This
modification changes the project delivery and completion times to read
as follows: The tug will be available for delivery within two (2)
weeks after award. All work shall be completed within three (3) weeks
of the tug entering drydock no later than 08/25/99. The required
maintenance and repair work has been modified to include sandblasting
and painting the hull and main deck, removing the rudder to inspect the
steering carrier bearing, pulling the propellor and tailshaft to
inspect cutlass bearing, replacing two (2) Raytheon fathometer
transducers, and relocating ballast pump piping in the engine room. The
due date for receipt of quotations has been changed to 07/07/99. Posted
05/26/99 (W-SN336014). (0146) Loren Data Corp. http://www.ld.com (SYN# 0044 19990528\J-0006.SOL)
J - Maintenance, Repair and Rebuilding of Equipment Index Page
|
|