COMMERCE BUSINESS DAILY ISSUE OF JUNE 4,1999 PSA#2360U. S. Army Engineer District, Savannah, P.O. Box 889, Savannah, Georgia
31402-0889 Y -- HOT CARGO REFUELING SYSTEM, PHASE I, POPE AFB, NC SOL
DACA21-99-B-0043 POC Mr. Craig L. Harrell, (912)652-5150 (Technical
Questions); Ms. Rosetta Brightwell, (912)652-5903 (Contractual
Questions) WEB: Corps of Engineers, Savannah District, Contracting,
http://www.usace.army.mil. E-MAIL: Rosetta J. Brightwell,
rosetta.j.brightwell@sas02.usace.army.mil. This project is to provide
a type III aircraft hydrant fueling system. The work includes a pump
shelter, control room, cathodically protected, underground stainless
steel distribution loop, and connections to three existing bulk fuel
storage tanks to use them as operating tanks. The pump shelter with
underground control room will be within the "fuel farm" adjacent to two
existing pump shelters. Also included is a new fill stand and HHT
checkout station to be provided across from the new pump shelter. Work
includes reconfiguration of existing underground utilities and
infrastructure. Site development work includes reconfiguration of
roads, security fencing, sidewalks and drainage. The potential for
encountering fuel contaminated soil exists. The work required will
involve the disposal only of the excavated, contaminated soil,
following applicable Federal/State/local safety procedures. Temporary
construction fencing is required. Estimated cost range of this project
is $1,000,000.00 to $5,000.000.00. Network Analysis Systems will be
required. THIS SOLICITATION IS SMALL BUSINESS SET-ASIDE, $17,000,000
SIZE STANDARD AS DEFINED BY THE SMALL BUSINESS ADMINISTRATION. PAPER
COPIES OF THIS SOLICITATION WILL NOT BE AVAILABLE. THIS SOLICITATION
WILL BE ISSUED IN ELECTRONIC FORMAT ONLY AND WILL ALSO BE AVAILABLE ON
OR ABOUT 07/09/99 ON THE INTERNET AT:
http://www.sas.usace.army.mil/ebs/. AMENDMENTS TO THIS SOLICITATION
WILL BE POSTED ON THE INTERNET AT THE ABOVE ADDRESS UNLESS THE TOTAL
AMENDED COMPRESSED FILES ARE GREATER THAN 5 MBYTES IN WHICH CASE A NEW
CD ROM DISK WILL BE ISSUED. FOR AMENDMENTS THAT ARE ONLY POSTED ON THE
INTERNET, SF30, AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT, AND
A LIST OF REVISED SPECIFICATIONS AND DRAWINGS WILL BE MAILED TO EACH
BIDDER. NOTE: ALL REQUESTS FOR SOLICITATIONS MUST BE MADE IN WRITING
AND RECEIVED NOT LATER THAN 06/29/99. A LIMITED NUMBER OF SOLICITATIONS
WILL BE PREPARED AND ISSUED ON A FIRST COME FIRST SERVED BASIS. THE
NUMBER OF SOLICITATIONS WILL BE LIMITED TO ONE (1)PER FIRM. STATE AREA
CODE, TELEPHONE NUMBER, STREET ADDRESS AND NINE-DIGIT ZIP CODE IN
REQUESTS. REQUESTS MAY BE FAXED TO 912-652-5828. Posted 06/02/99
(W-SN337839). (0153) Loren Data Corp. http://www.ld.com (SYN# 0139 19990604\Y-0017.SOL)