Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JUNE 4,1999 PSA#2360

U. S. Army Engineer District, Savannah, P.O. Box 889, Savannah, Georgia 31402-0889

Y -- HOT CARGO REFUELING SYSTEM, PHASE I, POPE AFB, NC SOL DACA21-99-B-0043 POC Mr. Craig L. Harrell, (912)652-5150 (Technical Questions); Ms. Rosetta Brightwell, (912)652-5903 (Contractual Questions) WEB: Corps of Engineers, Savannah District, Contracting, http://www.usace.army.mil. E-MAIL: Rosetta J. Brightwell, rosetta.j.brightwell@sas02.usace.army.mil. This project is to provide a type III aircraft hydrant fueling system. The work includes a pump shelter, control room, cathodically protected, underground stainless steel distribution loop, and connections to three existing bulk fuel storage tanks to use them as operating tanks. The pump shelter with underground control room will be within the "fuel farm" adjacent to two existing pump shelters. Also included is a new fill stand and HHT checkout station to be provided across from the new pump shelter. Work includes reconfiguration of existing underground utilities and infrastructure. Site development work includes reconfiguration of roads, security fencing, sidewalks and drainage. The potential for encountering fuel contaminated soil exists. The work required will involve the disposal only of the excavated, contaminated soil, following applicable Federal/State/local safety procedures. Temporary construction fencing is required. Estimated cost range of this project is $1,000,000.00 to $5,000.000.00. Network Analysis Systems will be required. THIS SOLICITATION IS SMALL BUSINESS SET-ASIDE, $17,000,000 SIZE STANDARD AS DEFINED BY THE SMALL BUSINESS ADMINISTRATION. PAPER COPIES OF THIS SOLICITATION WILL NOT BE AVAILABLE. THIS SOLICITATION WILL BE ISSUED IN ELECTRONIC FORMAT ONLY AND WILL ALSO BE AVAILABLE ON OR ABOUT 07/09/99 ON THE INTERNET AT: http://www.sas.usace.army.mil/ebs/. AMENDMENTS TO THIS SOLICITATION WILL BE POSTED ON THE INTERNET AT THE ABOVE ADDRESS UNLESS THE TOTAL AMENDED COMPRESSED FILES ARE GREATER THAN 5 MBYTES IN WHICH CASE A NEW CD ROM DISK WILL BE ISSUED. FOR AMENDMENTS THAT ARE ONLY POSTED ON THE INTERNET, SF30, AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT, AND A LIST OF REVISED SPECIFICATIONS AND DRAWINGS WILL BE MAILED TO EACH BIDDER. NOTE: ALL REQUESTS FOR SOLICITATIONS MUST BE MADE IN WRITING AND RECEIVED NOT LATER THAN 06/29/99. A LIMITED NUMBER OF SOLICITATIONS WILL BE PREPARED AND ISSUED ON A FIRST COME FIRST SERVED BASIS. THE NUMBER OF SOLICITATIONS WILL BE LIMITED TO ONE (1)PER FIRM. STATE AREA CODE, TELEPHONE NUMBER, STREET ADDRESS AND NINE-DIGIT ZIP CODE IN REQUESTS. REQUESTS MAY BE FAXED TO 912-652-5828. Posted 06/02/99 (W-SN337839). (0153)

Loren Data Corp. http://www.ld.com (SYN# 0139 19990604\Y-0017.SOL)


Y - Construction of Structures and Facilities Index Page