Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JUNE 14,1999 PSA#2366

92d Contracting Squadron W. 110 Ent St. (Suite 200), Fairchild AFB, WA 99011-9403

Z -- REVITALIZE EXTERIORS, FAIRCHILD AFB GYM AND BOWLING CENTER SOL F45613 99 R0010 DUE 080999 POC Contract Administrator, MSgt Douglas Guldan, (509) 247-4866; Contracting Officer, Barbara Hicks, (509) 247-4867 WEB: Electronic Procurement System Website, www.eps.gov. E-MAIL: Click here to contact the contract administrator, douglas.guldan@fairchild.af.mil. The objective of this project is to revitalize the exterior of buildings 2248 (Bowling Center) and 2249 (Base Gym), at Fairchild AFB, WA. The work includes, but is not limited to the complete removal of existing site asphalt and miscellaneous concrete paving; continuous saw cutting and removal of the entire existing loading dock and related concrete stairs, ramps, removal of existing lap siding and metal fascia. Civil work includes new site grading, removal and connections to existing storm, drain and fire hydrant systems; new concrete curbs, gutters, asphalt and concrete paving; poured in place and modular concrete retaining walls, site earthwork, landscaping and irrigation. A thin brick and face brick veneer shall be provided with a new continuous manufactured wall panel fascia. Entry canopies shall be provided containing structural steel and a metal roof system. Existing doors windows and frames shall be provided with vehicle and pedestrian ramps, stairs, and levelers. Electrical work includes new site and building mounted lighting and concealment of existing electrical and communications lines. Mechanical work includes relocation of various grilles and exterior HVAC equipment. This acquisition will use Best Value, Past Performance procedures. The magnitude of this project is estimated to be between $5 million and $10 million. Performance period for this project is 365 calendar days. This time period is further broken out into four separate phases. The first phase is 60 calendar days for submittals; the second through fourth phases (305 days), are for the contractor to complete the physical portions of the work. A separate Notices to Proceed will be issued for each phase. Work hours are 7:30 AM 4:30 PM excluding federal holidays. This work is not located in a restricted or controlled area. This project is 100% unrestricted. Any responsible source may submit a proposal. Estimated proposal issuance date is 08 Jul 99. Interested parties may download the solicitation package from www.eps.gov. This SIC Code for this acquisition is 1542. The business size standard is $17 million. The project will have four line items. The Base Items will consist of two line items for the Base Gym. Two Optional Line Items will be for the combination of the Base Gym and the Bowling Center. Award will be based on the amount of funding received. SPECIAL STRADDLE BID: FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS PROJECT. NO AWARD WILL BE MADE UNDER THIS SOLICITATION UNTIL FUNDS ARE AVAILABLE. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. Posted 06/10/99 (W-SN341719). (0161)

Loren Data Corp. http://www.ld.com (SYN# 0153 19990614\Z-0004.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page