|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 15,1999 PSA#2367United States Air Force, Pacific Air Forces, 354 CONS, 3112 Broadway
Ave, Unit 5B, Eielson AFB, AK, 99702-1887 28 -- TECHNICAL ASSISTANT FOR GENERAL ELECTRIC TURBINE OVERHAUL SOL
F6550399Q0302 DUE 070299 POC Richard Breedlove, Contracting Specialist,
Phone 907-377-3028, Fax 907-377-2389, Email
richard.breedlove@eielson.af.mil -- Brenda Green, Contracting Officer,
Phone 907-377-2810, Fax 907-377-2389, Email WEB: Visit this URL for
the latest information about this,
http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=P&ProjID=F6550399Q0302
&LocID=645. E-MAIL: Richard Breedlove,
richard.breedlove@eielson.af.mil. STATEMENT OF WORK The Contractor
will be required to produce copies of general electric specifications
and instructions as listed in this statement of work prior to the start
of the contract. 1. Request a General Electric Company or other
qualified technical representative to assist in inspection,
preventative maintenance and overhaul of one General Electric Turbine.
Provide assistance to determine through nondestructive inspection
(NDI) of suspect parts, if part replacement is required. 2. The scope
of work includes: a. Oversee and provide technical assistance for
overhauling one turbine. b. Opening of the unit. c. Inspect unit_s
assemblies. d. Measure clearance of thrust bearings, bearing, bearing
diameters, couplings, etc. and compare with data from previous
inspections and manufacturer_s assembly tolerance. e. Identify item (s)
to be photographed. f. Record evidence of, and evaluate erosion,
condition of seals, lack of lubrication, and unusual wear. (1) Oversee
and instruct parts cleaning, parts replacement, and normative
preventative maintenance actions. (2) Cleaning rotor blades with
aluminum oxide blast. (3) Replacing seals, gaskets, and worm parts. (4)
Measuring and recording thrust bearing clearances on units for
comparison for next inspection/overhaul. (5) Checking lubrication
system including pumps and filters. (6) Checking turning gear and
motor. (7) Checking governor and throttle mechanism. (8) Advise if any
repair or replacement of parts IAW manufacturing specifications
F-3305430-2A is required. (9) Observe and advise as required the
closing and test running of the turbine. (10) Observe the overspeed
trip test and advise. (11) Furnish a written report in five copies,
which states the following: a. Internal conditions noted. b. List of
parts replaced. c. Verify that measured tolerances are within factory
tolerances. (12) Contractor shall provide copies of all reference
manuals, drawings and specifications necessary to accomplish this work.
3. Other factors: a. All parts will be U.S. Government furnished
property. A complete list of all Government furnished property is not
necessary. The contractor is only advising On replacement IAW scope of
work. b. Test and inspections are to be performed by site personnel
IAW the following General Electric specifications: (1) Armature
Specification A-3303499-A (2) Field Specification F-3305430-2A (3)
Vibration Test IAW test instruction K-9468227 c. Contractor must
provide an authorized/warranted representative. Contractor will provide
transportation, meals, and lodging to Clear A.S. d. One-year warranty
of overhaul is required. Warranty to cover re-performing any defective
service or workmanship and will conform to any mutually agreed upon
specification for a period of one year from date of completion of
service. e. The turbine overhaul will require one fully qualified
technician for approximately 30 days. All work will be accomplished at
Clear A.S., Alaska. "Numbered Note 1" Posted 06/11/99 (D-SN341968).
(0162) Loren Data Corp. http://www.ld.com (SYN# 0186 19990615\28-0002.SOL)
28 - Engines, Turbines and Components Index Page
|
|