COMMERCE BUSINESS DAILY ISSUE OF JUNE 21,1999 PSA#2371Department of the Army and Air Force, NGB, USPFO for Maine, Camp Keyes,
Augusta, Maine 04333-0032 E -- PRIVATIZATION UNDER 10 USC 2688, UTILITY SYSTEMS: CONVEYANCE
AUTHORITY AT BANGOR IAP-ANG BASE AND SOUTH PORTLAND ANG STATION
(CORRECTED NOTICE) DUE 071599 POC Contracting Officer -- CPT Robert P.
Crowley, 207 626-4581 E-MAIL: click here to contact the contracting
officer via, crowleyrj@me-arng.ngb.army.mil. PURPOSE: Avila Government
Services, Inc., as a contractor to the USAF seeks to identify
responsible potential sources and obtain information in regards to
privatization of utility systems in accordance with 10 USC 2688,
"Utility Systems: Conveyance Authority". The Commander of Bangor
IAP-ANG Base is seeking interest and information specifically for the
potential privatization of the electrical utility system at South
Portland ANG Station. OBJECTIVE: Should privatization result, the
ownership of the South Portland ANG Station electrical utility system,
operation and maintenance and obligation to continue to provide
utility service for an indefinite and ongoing period will transfer to
a utility service provider. All responsibility for maintaining reliable
utility service, including such items as environmental compliance,
maintenance costs, major system renovations, construction, equipment,
manpower and overhead costs will become the utility service provider's
responsibility. It is intended that the privatization will ultimately
reduce the Air Force's life-cycle costs for operating and maintaining
utility systems and services. SYSTEM DESCRIPTIONS: At South Portland
ANG Station the electrical system includes a total of approximately 60
linear feet of secondary cable located between each of the two
transformers and their electric meters. PROCEDURES: This request to
interested parties is for gathering information and is a required
component and systematic process to evaluate the interested parties
under the Air Force's utilities privatization program. In order to
minimize costs both to potentially interested parties and the
government, this notice is being issued to determine the interest and
feasibility of proceeding with a formal request for proposals. Should
insufficient credible interest be identified for a privatization
action, it is highly likely that no formal solicitation will be issued.
SHOULD INTEREST BE DETERMINED SUFFICIENT, A FORMAL REQUEST FOR
PROPOSALS MAY BE FORTHCOMING. Small Business interests shall note the
FAR Part 19 Standard Industrial Codes (SIC) and Size Standards for the
utility systems identified in this announcement. Some, all, or any
combination of the following may apply. SIC/SS: 4911/4Million (M)
Megawatt hours, 4922/$5M, 4923/$5M, 4924/500, 4925/$5M, 4931/$5M,
4932/$5M, 4939/$5M, 4941/$5M, 4952/$5M, 4953/$6M, 4959/$5M, 4961/$9M,
4971/$5M. REQUESTED RESPONSE: Interested parties should provide a
statement of interest on company letterhead (not to exceed 20 pages in
length). The statement should include as a minimum the following
criteria: (1) specific utility system(s) of interest and desired
grouping of utilities to purchase; (2) capability and experience in
ownership, operation and maintenance of similar utility systems; (3)
financial capacity to purchase, expand and operate the utility systems;
(4) statement detailing the legal right to service, own, operate, and
maintain utility systems within state laws; (5) conceptual rate plan
(excluding numerical analysis or proposed rates), i.e.will charges for
utility service be made from existing rates from rates developed
specifically for service at the individual base(s); (6) ideas regarding
conjunctive metering and billing for service on base (excluding
numerical analysis or proposed rates); (7) discussion of your
conceptual basis (excluding numerical analysis or proposed prices) for
a proposed purchase price (capitalized earnings value, replacement
cost new less depreciation, original cost less depreciation, or other);
(8) statement detailing your understanding of applicable state and
local utility laws and regulations and your compliance capability; (9)
statement detailing your understanding of any existing franchises and
your ability to provide service given these conditions; (10) statement
detailing your understanding of federal, territorial, and local
environmental laws and regulations and familiarity and experience with
environmental compliance procedures and regulations for Maine and the
U. S. Environmental Protection Agency; and (11) business size (large,
small, small-disadvantaged, 8(a), women-owned). Elaborate proposals or
pricing information is neither required nor desired. Under no
circumstances will cost data for the existing systems be provided. Any
innovative and new conceptual ideas to achieve the stated objective
are encouraged. The point of contact is Ed Von Hagel, Tel (703)
836-3855 (Extension 121). Posted 06/17/99 (W-SN344192). (0168) Loren Data Corp. http://www.ld.com (SYN# 0024 19990621\E-0001.SOL)