Eldorado National Forest, 100 Forni Road, Placerville, CA 95667

Y -- PILLIKEN ROAD SURFACING SOL RFP-R5-03-99-49 DUE 081299 POC Kathryn M. Griffin, CO, 530/622-5061x5295, or Mike Mitchell,COR, 530/621-5283 WEB: RFP-R5-03-99-49 Pilliken Road Surfacing, www.clarint.com/tnf. E-MAIL: RFP-R5-03-99-49 Pilliken Road Surfacing, acquisitions/r5_eldorado@fs.fed.u. Correction to CITE: (W-173 SN345710) Corrects Response Date. All other information remains the same. Project consists of approximately 1.91 miles of Forest Road Reconstruction. Major items of work include Clearing and Grubbing, Excavation, Placement of 4050 tons of Aggregate Base, Reconditioning of Roadbed, Removal of Trees, Mobilization, Installing Drainage Ditches, Graded Dips, Lead Off Ditches, Catch Basins, Inlet Basins, and Corrugated Metal Pipes. Estimated range is between $100,000 and $250,000. Project is broken into 2 segments. Project is located off the Mormon Emmigrant Trail ( Iron Mountain Road )in El Dorado County, Calif. To reach Project beginning and Segment A from Placerville, travel East 15 miles on U.S. Route 50 to the Sly Park Road Turnoff. Then travel South on Sly Park Road (E-16) approx 5 miles to the Mormon Emmigrant Trail Turnoff. Then travel East on Mormon Emmigrant Trail (10N50) approx. 13 miles to the Pilliken Road Turnoff. Then travel approx. 3 miles East on Pilliken Road (10N46) to the Project beginning. ( DUE TO THE LARGE WASHOUT OF THE CAMP CREEK CROSSING, DIRECTIONS TO SEGMENT B ARE AS FOLLOWS. ) To reach Segment B from Placerville, travel East 15 miles on U.S. Route 50 to the Sly Park Road Turnoff. Then travel South on Sly Park Road (E-16) approx. 5 miles to the Mormon Emmigrant Trail Turnoff. Then travel East approx. 17 miles on Mormon Emmigrant Trail (10N50) to the 9N36 Road Turnoff. Then travel approx. 1 mile on Road 9N36 to the 9N40Y Turnoff. Then travel approx. 1/2 mile on Road 9N40Y to the 9N19.2 turnoff. Then travel approx. 1/4 mile on 9N19.2 to the 10N47 Road turnoff. Then travel approx. 2 miles on 10N47 to the Project site. There will be a pre-bid meeting on July 23, 1999 @ 10:00 am at the intersection of Morman-Immigrant Trail and Pilliken Road (10N46). Solicitation package to be ready approximately July 13, 1999. To request solicitation package, please place request via web site, email, or via fax (530) 621-5258 Posted 06/22/99 (W-SN345811). (0173)

Loren Data Corp. http://www.ld.com (SYN# 0103 19990624\Y-0002.SOL)


Y - Construction of Structures and Facilities Index Page