|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 24,1999 PSA#2374National Park Service, Southeast Field Area, 1924 Building, 100
Alabama, SW, Atlanta, Georgia 30303 Z -- ASBESTOS CLEANUP, REMOVAL AND DISPOSAL SOL IB5000990028 DUE
083199 POC Dianne Mitchell, (404) 562-3163 Ext 575 WEB: National Park
Service, dianne_mitchell@nps.gov. E-MAIL: National Park Service,
dianne_mitchell@nps.gov. Contractor shall provide all labor, materials,
supervison and equipment to cleanup, removal and disposal of all
asbestos containing materials (ACM) in the basement and crawl spaces of
a concrete one story residential type building. In addition, the boiler
shall be tested for ACM. The full concrete basement has a concrete
floor and concrete/terra cotta tile ceiling approximately 8 feet high.
The basement is accessed by concrete stairway which leads directly
outdoors to the rear building. It is divided by concrete partition
walls into several rooms and a central corridor. It also contains a
double-height boiler room, accessed from the corridor by a metal
stairway. The two crawl spaces are approximately 4 ft high, have dirt
floors and are enclosed by concrete walls. They are located at opposite
ends of the building. They are accesible only through 2.5 ft sq
manholes in the basement bedroom wall and the boiler room wall. The
abatement areas contain approximately 670 LF of 4" -8" diameter pipe
that is covered with 40% chrysotile piping insulation. Much of the
insulation is friable and there is dust and debris on many surfaces
through the project area. Boiler and raditors related to the heating
system are also located in the basement. Location: Vicksburg National
Military Park, Vicksburg, MS. Price Range: $25,000.00 -- $100,000.00.
Only written requests. Fax number is (404)562-3256. Please reference
the solicitation #IB5000990028 Posted 06/22/99 (W-SN345696). (0173) Loren Data Corp. http://www.ld.com (SYN# 0137 19990624\Z-0012.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|