COMMERCE BUSINESS DAILY ISSUE OF JULY 8,1999 PSA#2383United States Postal Service, Major Facilities Office, 225 North
Humphreys Blvd, Memphis, TN 38166-0300 Y -- SAN FRANCISCO BULK MAIL CENTER, RICHMOND, CA -- DESIGN/BUILD
EXPANSION SOL 475450-99-A-0050 DUE 080999 POC Bettye Perkins;
901/747-7628 -- FAX 901/747-7408 WEB: United States Postal Service,
www.usps.gov. E-MAIL: United States Postal Service,
bperkins@email.usps.gov. This project is for a contract to design and
construct an approximately 66,800 gross square foot expansion at the
San Francisco Bulk Mail Center located on 2501 Rydin Road, in Richmond,
CA, 94804-9751. The project consists of furnishing manpower, materials,
equipment, and supervision necessary for fast track design and
construction of the expansion. The project includes partial demolition
of existing building/equipment, utilities, landscaping, storm
drainage, concrete sidewalks/pads, metal canopy, etc., as required. The
existing facility is approximately 464,000 gross sq. ft. and was built
in 1975, with an addition completed in 1987. The expansion will be on
the southwest side of the existing facility and will displace part of
the loading dock areas on the existing south and west walls. The
facility must remain fully operational at all times. Three phases of
construction are required for this project. Site preparation and
development will include concrete paved loading dock aprons and asphalt
paved parking. The building expansion shall be a concrete slab on grade
with foundations as required, steel structure separated from the
existing BMC by seismic joints, metal insulated deck with an EPDM or
4-ply asphalt built-up roofing system, etc. Exterior enclosure shall
match the appearance of the existing structure. The existing facility's
HVAC system, water and air will have to be balanced when the building
expansion is complete. Provide HVAC, compressed air, etc., systems,
utilities, landscaping, storm drainage, concrete sidewalks/pads,
sprinkler system, etc., at the above postal facility in accordance with
plans and specifications. Technical Qualifications Evaluation is based
on a 100-point total (Experience -- 40 points, Management Plan -- 30
points, Financial Capability -- 15 points, Organization -- 15 points).
Plans and specs will be available July 7, 1999. Offers are due August
9, 1999, at 4 p.m. Performance Time is 430 days from receipt of notice
to proceed. The estimated cost range is between$6,900,000 and
$7,300,000. On-site contact is Mr. Bill Leong, Activation Coordinator
at the facility (510/528-9776). Cost of specifications and drawings is
$250 per set for Priority Mail service (2 to 3 days) and $300 per set
for Express Mail service (next day). All charges are non-refundable.
They may be ordered as follows: Send your written request, along with
a check or money order made payable to Rapid Reproductions, Attn: USPS
(jraley2001@aol.com), 5300 Pleasant View Rd., Memphis, TN 38134-6414,
FAX 901/385-2679. Current planholders' list is available by FAX
request to this number as well. Please reference the subject
solicitation number on your request. Offerors are encouraged to submit
their proposal using one of the methods offered by the Postal Service
(First Class, Priority Mail, Express Mail.) To expedite receipt of
solicitation packages, FAX a copy of your check or money order before
mailing it. If FAX is received before 1:00 p.m., the plans and specs
will be mailed that day via two/three-day Priority Mail. If you desire
to have them sent via Express Mail, send additional $50 for each set.
Check the internet for government contracting at
http://www.govcon.com. and for postal projects at
http://www.purchasing.gov (BOB-Business Opportunity Bulletin). Also
check http://cbdnet.access.gpo.gov for free search of Commerce Business
Daily. Plans will also be available for inspection at the following
locations: (1) Manager, San Francisco Bulk Mail Center, 2501 Rydin
Road, Richmond, CA 94804-9998; (2) Local Plan Rooms; and (3) F.W.
Dodge, Inc. The U.S. Postal Service, Major Facilities Office, is
seeking and encouraging participation of Minority-Owned and Woman-Owned
businesses in this project. This is a negotiated procurement,
therefore, offers will not be publicly opened, and no information can
be made available until after contract award, which may take 90 days,
and your request for offer results is received in writing. Posted
07/05/99 (W-SN350354). (0186) Loren Data Corp. http://www.ld.com (SYN# 0108 19990708\Y-0028.SOL)