|
COMMERCE BUSINESS DAILY ISSUE OF JULY 14,1999 PSA#2387USDI, El Malpais National Monument, P.O. Box 939, 123 E. Roosevelt,
Grants, New Mexico 87020 Z -- STABILIZATION OF HISTORIC BUILDING SOL 1443IB742099001 DUE 083199
POC Trish Fresquez-Hernandez, Contract Specialist, El Malpais NM,
505-285-4641, extension 11 Stabilization of Building HB-3, The Two
Story Barn, Hubbell Trading Post National Historic Site. The Two Story
Barn is one of 19 historic structures at Hubbell Trading Post NHS and
is comprised of a total of 10,200 square feet. The walls of The Two
Story Barn are of rough-hewn stones pointed with adobe clay mortar with
the floor and roof made up of ponderosa pine vigas and latillas. The
work under this contract consists of constructing structural
improvements and making repairs to The Two Story Barn. Specific work
items include: removal of plywood and foam deck materials and
installing steel and lightweight concrete deck at loft floor;
installation of additional timber joists at loft floor; removal and
replacement of 4 roof vigas; installation of diagonal steel rod
bracing, and repair of cracks and repointing at rubble stone masonry
walls. Written or facsimile requests for copies of the solicitation are
preferred. FAX: 505-285-5661. Posted 07/12/99 (W-SN352935). (0193) Loren Data Corp. http://www.ld.com (SYN# 0146 19990714\Z-0001.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|