COMMERCE BUSINESS DAILY ISSUE OF JULY 19,1999 PSA#2390USDA Forest Service, Procurement Office, 1700 Bypass Road, Winchester,
Kentucky 40391 Y -- REPLACE THE PRINCIPAL SPILLWAY/OVERFLOW PIPE OF THE GROUSE HOLLOW
DAM SOL R9-99-12-31 DUE 090199 POC STEVEN E. MUMFORD (606)745-3127 or
KIM EARNEY (812)275-5987 The project consists of repairing the Grouse
Hollow Dam by replacing the principal spillway/overflow pipe. The work
includes, but is not limited to a) Removing the existing metal drop
tube spillway/overflow pipe and replacing it with a plastic pipe
spillway/overflow pipe, sloped through the dam; b) Regrading and
reseeding of the emergency earthen spillway and the dam surface; and c)
other work such as clearing and grubbing, placement of rip-rap, etc. as
necessary for a complete job. The Contractor will provide all necessary
labor, supervision, equipment, materials, and supplies. The work will
take place at the Grouse Hollow Dam on the Brownstown Ranger District
of the Hoosier National Forest in Lawrence County, Indiana. This
solicitation will be awarded under the request for written quotation
procedures with anticipated award on August 8, 1999. Posted 07/15/99
(W-SN354327). (0196) Loren Data Corp. http://www.ld.com (SYN# 0322 19990719\Y-0055.SOL)