Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JULY 22,1999 PSA#2393

Department of the Air Force, Direct Reporting Units, 11th CONS, 110 Luke Avenue, Building 5681, Bolling AFB, DC, 20332-0305

Y -- DEMOLITION OF BUILDING 1574 SOL F49642-99-T-0263 DUE 073099 POC Daffeney Dortly, Contract Specialist, Phone 2027677873, Email WEB: Visit this URL for the latest information about this, http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=P&;ProjID=F49642-99-T-0 263&LocID=207. E-MAIL: Daffeney Dortly, daffeney.dortly@bolling.af.mil. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This request for quotation (RFQ) _ 99T0263. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 97.5. This is a small-business set aside. The standard industrial classification code is 1795 and the small business standard is $7 million. The 11th Contracting Squadron intends to procure, on a competitive basis, a non-personal service to include all labor, tools, supplies, equipment, transportation, supervision and other items and services necessary to perform demolition of approximately 1500 linear feet of fence and approximately 560 square feet of brick guard house located at building 1574, Bolling AFB, DC. Contractor is responsible for verifying all quantities and measurements. Description of Requirements: The contractor shall demolish building 1574, including but not limited to electricity, water, sewer condensation tanks, pumps, valves, plumbing fixtures, wiring, electrical panels and lights and foundation and concrete surfaces surrounding the facility. Work shall also include removal of approximately 1500 linear feet of wire fence to include steel post with concrete footing and four 12_ x 8_ gates. The government prior to contractor notice to proceed will turn off utility service to the building. The contractor shall proceed with demolition only after notice to proceed by the contracting officer. Contractor operations shall be confined to the area indicated on the area map. Maps will be provided during the site visit. All demolished materials shall become the property of the contractor. Disposal shall be his /her responsibility including dumping fees or permits. All material disposal shall be in compliance with applicable federal, state, county and environmental regulations. Contractors shall completely backfill and reseed all holes left from the fence removal operation. Contractor shall perform grade liming, fertilizing, spreading soil additive, and sodding of affected area. Areas disturbed by contractor outside the areas designated by the QAE shall have similar treatment. Fertilizer and lime shall be delivered to the site in the original, unopened containers bearing the manufacturer_s name and chemical analysis and conform to local, state and federal laws. During and after delivery fertilizer and lime shall be kept in dry storage away from contaminants. Precautions shall be taken to protect containers from rupturing. The contractor shall be totally responsible for insuring growth in the affected areas. The contractor shall replace sod not showing a healthy growth. Water and electricity will be furnished to the contractor by the government from existing system outlets and supplied at no cost to the contractor. The location of the temporary connection points will be designated by the QAE after award of contract. The contractor shall not use government telephone services. Excess waste materials shall be removed from the areas daily by the contractor. After refurbishing operations have been completed, the area shall be cleared of all debris and excess materials. For base entry, the contractor shall submit to the contracting officer, a list containing names of individuals performing on this contract. 11th Security Forces personnel will issue passes at the base visitor_s center. Each employee shall have in his or her possession a photo identification card and approved base passes while on Bolling AFB. The contractor shall comply with OSHA 1926, Construction Standards. All contractor vehicles shall enter and exit Bolling AFB through the south gate and proceed to the work site via Chappie James Blvd. The Contractor shall cover open bodied vehicles transporting sand, gravel, and fill material, dirt, construction debris, rubble or other material, which may become airborne and create pollution on base. The contractor shall at all times provide adequate supervision of employees to ensure complete and satisfactory performance of all work in accordance with the terms of the contract. Prior to demolition, the contractor shall acquire and have in his possession at all times an approved AF Form 103. Contractor shall coordinate with the QAE for processing of this form. AF Form 103 shall be completed seven to ten days prior to the start of actual demolition and shall remain valid for ten days. The contractor shall notify the QAE for revalidation of this form ten days from original date if needed. Utilities shall be marked one time per AF Form 103 validation. It shall be the contractor_s responsibility to maintain these marking for the duration of the contract, by means of stakes, flags, etc., as may be necessary to make the workers aware of utilities. The contractor shall coordinate work operations with the contracting officer prior to starting work under this contract. The contractor shall perform operations, Monday through Friday from 7:15 AM to 4:00 PM. A site visit will be held on 27 July 1999 at 1:00 p.m. The Government will provide maps of the site location during the site visit. All responses must be received by close of business 30 July 99. Awards will be made on or around 6 Aug 99. Contractors must be registered in the Central Contractor Registration (CCR) to be eligible for award. Contractors can contact the CCR by calling 1-888-227-2423. The following statements, clauses and provisions are incorporated in this solicitation: 52.212-1, Instruction to Offerors _ Commercial. 52.212-3, Offerors Representation and Certifications _ Commercial Items. 52.212-5, Contract Terms and Conditions Required to Implement Statues of Executive Orders _ Commercial Items apply to this acquisition, specifically, the following cited clauses are applicable: 52.222-6, 52.222.42, and 52.225-3. Questions concerning the solicitation may be addressed to SSgt Daffeney L.Dortly (202)767-7873. Posted 07/20/99 (D-SN356429). (0201)

Loren Data Corp. http://www.ld.com (SYN# 0160 19990722\Y-0025.SOL)


Y - Construction of Structures and Facilities Index Page