Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JULY 29,1999 PSA#2398

Fluor Daniel Northwest, 1200 Jadwin, PO Box 1050, MSINB4-67, Richland, WA 99352

56 -- INSTALLATION OF INSULATING (REFRACTORY) CONCRETE OF TWO CONCRETE VAULTS, CONSTRUCTION OF A MODULAR OFFICE COMPLEX, DECONTAMINATION SHOWER, FIREPROOFING TO STRUCTURAL STEEL, FABRICATION AND INSTALLATION OF TWO CRASH GATES, WELDING TUBES, AND PROVIDING AND INSTALLING TUBE/PLUG EXCHANGE FIXTURE A SOL 100331-9-K00015 DUE 090399 POC Pat Masar, (509) 376-2887 Fluor Daniel Northwest (FDNW), RFP No. 100331-9-K00015 is scheduled for release on or about August 6, 1999, with a due date on or about September 3, 1999, and a Notice-to-Proceed date in early October 1999. The work consists mainly of procuring and installing insulation material (refractory) to concrete in two underground vaults of the Canister Storage Building of the Spent Nuclear Fuels Area. This Work will require special heating of the concrete in order to meet the insulation material application requirements. In addition, the contractor will install a modular office complex with utilities, install a decontamination shower, apply fireproofing to structural steel in receiving bay, fabricate and install two crash gates, weld existing storage tubes to the CSB structure, provide and install a tube exchange fixture and tube/plug station, and perform other related miscellaneous construction. Applicable SIC's: 1542, 1711, 1731, 1771, 3088, 3431, 5039 A lump sum fixed price contract is contemplated in the estimated range of $3-4,000,000 with a period of performance of 150 days commencing in early October 1999. The work is in a controlled access area located in the 200 East Area of the Department of Energy Hanford site that is approximately 48 kilometers Northwest of Richland, Washington. A site tour at the RFP designated time/date and place is mandatory in order to bid this Work. The successful Offeror (General Contractor) shall meet all Quality Assurance Program (QAP) requirements under the authority of the Price Anderson Amendments Act of 1988. Contractor must have a current viable and operational Quality Assurance Program developed from the U.S. Department of Energy Nuclear Safety Management Regulation 10 CFR 830.120 or from other National standards such as ASME NQA-1, 10 CFR50, 10 CFR72, IS0 9000, ASQ E4. Before an award is made, the Contractor shall be audited to these standards. In this audit the Contractor shall demonstrate his knowledge of the requirements through past applications and Plans. We request ONLY those Contractors who meet these stringent requirements submit an Expression of Interest letter. Expression of Interest Interested Offerors who can meet all of the qualification criteria cited above are to submit an Expression of Interest letter to the address stated herein to be received no later than close of business, August 6, 1999. Interested Offerors may fax their letters to the following: Mr. Pat S. Masar Contract Placement Fluor Daniel Northwest 1200 Jadwin Richland, WA 99352 Telephone (509) 376-2887 Fax (509) 372-3334 Posted 07/27/99 (W-SN359655). (0208)

Loren Data Corp. http://www.ld.com (SYN# 0300 19990729\56-0002.SOL)


56 - Construction and Building Materials Index Page