COMMERCE BUSINESS DAILY ISSUE OF AUGUST 4,1999 PSA#2402Management & Training Corporation. (MTC), 3173 Kerry St., San
Bernardino, CA 92407 E -- REMOVE EXISTING ASPHALT, POUR CEMENT SLAB AND CONSTRUCT 26 GAUGE
METAL BUILDING. SOL MB99-0719 DUE 080999 POC Brad Bruton, Purchasing
Agent, (909) 887-6305, EXT. 205. The Management & Training Corporation,
d.b.a., Inland Empire Job Corps Center is currently seeking bids for a
56 ft. x 130 ft. x 14 ft. high at eves, 1:12 roof slope pre-engineered
26 gauge steel building designed for a 12/20 live load and a 80 m.p.h.
wind load. The specifications are as follows: Cut and remove existing
asphalt paving as necessary, form and pour 4" reinforced concrete
floor pad, provide two gas HVAC units with cooling capacity of 77.6
heating capacity 120 input 97 output, two concrete pads for HVAC units,
flex type duct work as necessary, two 3'0" x 7'0"1-3/4 metal flush
panel entrance door complete with the necessary hardware (panic bar)
and level style lock, two 20'0" wide x 10'0" high steel roll-up doors,
chain operated, eight 3'0" x 6'8" pre-hung ready finish steel doors
with steel frames with necessary hardware (panic bar) and lever style
lock, two 3'0" x 6'0" steel door key entrance type hardware, five ea.
12" (throat) by 10' long low silhouette ridge ventilator complete,
including chain operated dampers and bird screen, ten ea. 3' wide x 10'
long white solar block plastic translucent light panels, furnish all
necessary materials, labor and equipment to construct interior walls as
shown by drawings for two ea. restrooms, two ea. Offices, two ea.
Storage rooms, two ea. classrooms and one ea. 56' fire wall across the
center of the metal building, R-value 6" insulation of ceiling and
walls, interior painting, two ea. unisex restroom closet stall (HDPE
partition-graffiti proof) and urinal (privacy wall), two ea. sinks,
stub out plumbing for future additions of one ea. restroom off existing
restrooms including water closet drain for both restrooms, two ea.
mirrors 18" wide x 24" high, one ea. restroom metal grab bar 36" long,
one ea. restroom metal grab bar 42" long, install two ea. (stainless
steel) slop sinks, one ea. 5-gallon electrical hot water heater
complete with all necessary piping and blow-off devices, two ea.
outside hose bib, install two ea. 3' x 4' (sliding) window (double
pane) in each office, install acoustical ceiling in office and
class-room areas, provide necessary work, stubbing out for water, gas,
sewer, conduit for-telephone, data, and fire, include all necessary
plumbing and drains. Please send bid to Brad Bruton, Purchasing Agent,
at P.O. Box 9550, San Bernardino, CA 92407. For Technical information,
call Greg Doyle, Vocational Manager at (909) 887-6305, EXT. 233. This
site is a U.S. Department of labor Corps Center operated under contract
to MTC. Posted 08/02/99 (M-SN361878). (0214) Loren Data Corp. http://www.ld.com (SYN# 0041 19990804\E-0002.SOL)