COMMERCE BUSINESS DAILY ISSUE OF AUGUST 10,1999 PSA#2406U.S. Environmental Protection Agency, Contracts Unit, 100 Alabama
Street,S.W., Atlanta, GA 30303 A -- CHATTANOOGA COMMUNITY BASED ENVIRONMENTAL PROTECTION AIR
MONITORING HUMAN HEALTH RISK ASSESSMENT SOL RFQ-GA-99-0025 DUE 081699
POC Nancy M. Watkins, 404/562-8377 TASK 1 Develop a Project
Implementation Plan Prepare an Implementation Plan detailing the
activities necessary to meet the objectives of this work assignment.
This plan will include the following: A proposed schedule of meetings
and deliverables, including the development of meeting minutes; and a
cost estimate. It is anticipated that a draft document will be
developed with one round of comments prior to finalization. TASK 2
Develop a Risk Assessment Work Plan and Quality Assurance Project Plan
Develop a risk assessment work plan detailing the technical
methodology by which data will be collected, summarized, and evaluated
to determine health risk to residential receptors through the
inhalation pathway. The workplan will include a conceptual site model
and a propossed approach to evaluate both individual and population
risk. Specifically, the workplan will outline the basis for and the
methods by which the following items will be evaluated: Data collection
and reduction; Data evaluation, including determination of Chemicals of
Potential concern; Toxicity assessment; Exposure assessment; Risk
characterization; and Evaluation of uncertainties. The workplan will
also include a quality assurance project plan that outlines the methods
that will be used to ensure the quality of the data and data evaluation
for use in risk-based decision making. The contractor will provide the
risk assessment workplan in draft, interim draft, and final versons.
Depending on the level of comments, fewer drafts may be required. TASK
3 Risk Assessment Develop the risk assessment according to the
workplan developed under Task 2. The contractor will provide the risk
assessment results in draft, interim draft, and final report. Depending
on the level of comments, fewer draft may be required. TASK 4 Risk
Communication The contractor will support EPA in presenting the results
of the risk assessment to the general public by developing a
communications strategy and outreach materials that will provide the
Alton Park and Piney Wood communities with a full understanding of the
developed risk assessment. The communications strategy and outreach
materials will be provided in draft, interim, and final formats.
Depending on the level of comments, fewer drafts may be required. The
contractor will assist in the presentation of these materials to the
community in a public meeting. Request for Quotation RFQ-GA-99-0025 is
being issued for this requirement. A copy of the RFQ and the Scope of
Work may be obtained by submitting a written request to Nancy M.
Watkins, FAX 404/562-8370. All responsible sources may submit an offer
which will be considered.**** Posted 08/06/99 (W-SN364562). (0218) Loren Data Corp. http://www.ld.com (SYN# 0005 19990810\A-0005.SOL)