COMMERCE BUSINESS DAILY ISSUE OF AUGUST 16,1999 PSA#2410Department of Veterans Affairs Medical Center, 50 Irving Street, N.W.,
Washington, DC 20422 J -- P/M SIEMENS CARDIAC CATH LAB EQUIPMENT SOL IFB 688-9-00 DUE
083099 POC Joyce Forker Invitation for Bids No. 688-9-00 is a combined
synopsis/ solicitation for commercial items for the Department of
Veterans Affairs Medical Center (VAMC) in Washington, DC, is prepared
in accordance with the format in FAR Subpart 12.6, as supplemented with
additional information in this notice (SIC 7699). This announcement
constitutes the only solicitation; bids are being requested and a
written solicitation will NOT be issued. Contractor shalL furnish all
labor, equipment, tools, parts, and materials (excluding glassware)
required for inspection, on-call repair service, and Preventive
Maintenance (PM) or equipment listed and located at the VAMC, 50 Irving
Street, NW, Washington, DC. The contract period will be from the date
of award through September 20, 2000, and award is subject to the
availability of funds. Contract may be amended for two (2) one year
options in accordance with the clause at 52.217-9, Option To Extend the
Term of the Contract. Schedule of Equipment -- Located in the Cardiac
Cath Lab, Room 4A124, Site 14909 -- (1) Vidomatics Model #4821807 S/Ns
01822, 01822J, 01869, 01869J (4ea); (2) Cinematics Model #8457111 S/N
01534 & 01544 (2ea); (3) Polydoros 80 Model# 8701708 S/N 01489 & 01492
(2ea); (4) Digimatic Model # 8710931 S/N 01210, 01215 & 01246 (3ea);
(5) Control Console PC Model #8713422 S/N 01185 & 01212 (2 ea); (6) PL
80 Fluro Modules Model # 9747429 S/N 01017 & 01018 (2 ea); (7) Sirecon
27 HD TRIFs Model #8441685 S/N 02255 & 02259 (2ea); (8) MEGA 30/82-CGLW
Model #8867301 S/N 01110 & 01600 (2ea); (9) Coroskop C Model # 9023136
S/N 01413 (1 ea); (10) Coroskop L Model # 9023144 S/N 01282 (1 ea);
(11) Koordinat 3D II Model #9023367 S/N 04472 (1 ea); (12) Heart
Contour COL Model #4976742 S/N 01458 & 01721 (2 ea); (13) Videomed C
Model #1102313 S/N 51194 & 51196 (2ea); (14) Monitor 38CM Model #
8714503 S/N 01184 & 01187 (2ea); (15) Monitor 44CM Model #8714537 S/N
02422 (1ea); (16) Monitors Model # 8714560 S/N 02167, 02173, 02175, &
02192 (4ea); (17) Digitron 3 VACI Model #9871641 S/N 01041 (1ea); (18)
Transicon HC Model #4460556 S/N 04366 (1ea); (19) Arritechno 35/90
Model # 7112006 S/N 07778 & 07809 (2ea); (20) GLIX Board, GDIX Board,
VSGX Board, Z115 Board (1ea). Bidders shall submit a price covering all
equipment for the Base Year (12 mos.) of the contract, Option Year I
(12 mos.) & Option Year II (12 mos.) Normal hours of coverage for this
contract are Monday through Friday 8:00a.m. to 4:30 p.m., excluding
Federal holidays. All service/repairs shall be performed during normal
hours of coverage with prior approval of the COTR. At the request of
the Contractor's Field Service Engineer (FSE), the COTR may approve
service outside normal hours of coverage at no extra cost to the VAMC.
The FSE shall perform PMs in accordance with manufacturer
specifications. PMs include but shall not be limited to: performing p/m
in accordance with the manufacturer specifications, cleaning equipment;
reviewing operation system software diagnostics to ensure that the
system is operating in accordance with manufacturer's specifications;
calibrating and lubricating the equipment; performing remedial
maintenance/repairs of non-emergent nature; testing and replacing
faulty and worn parts and/or parts likely to become faulty, fail, or
become worn (does not include glassware); inspecting all high voltage
cables and bushings, replacement of dielectric as necessary, inspecting
and replacing where indicated, electrical wiring and cables for wear
and fraying; inspecting and replacing where indicated, all mechanical
components which may include but not limited to; x-ray tube mounting
hardware, electron tubes and cathode tubes, patient restraints and
support devices, cables and mounting hardware, chains, belts, bearings
and tracks, interlocks, clutches, motors, keyboards, and patient
couches for mechanical integrity, safety, and performance; returning
the equipment to the operating condition defined in the Conformance
Standards; measuring, adjusting, and calibrating for optimal image
quality (applicable only for imaging equipment); providing
documentation of services performed, including photographs, radiation
dosage measurements, and all applicable x-ray film exposures, of all
measurements and calibration to ensure that the system is performing in
accordance with the CDRH regulations, Title 21, Chapter I, Subchapter
J, Radiological Health, Part 1020, Performance Standards for Ionizing
Radiation Emitting Products, Sections 30 & 33 as applicable, based upon
the date of system manufacture or remanufacture (as applicable); and
inspecting and calibrating the hard copy image device (as applicable).
Preventive maintenance shall be performed bi-annually in the months of
December and June. The day of the PM service must be scheduled by the
FSE and the COTR at least a week in advance. All exceptions to the
preventive maintenance schedule shall be arranged and approved in
advance with the COTR. Any charges for materials such as lubricants,
fluids, cleaning supplies, parts, services,manuals, tools, or software
required for the Contractor to successfully complete scheduled PM
shall be provided by the Contractor and are included within this
contract, and its agreed upon price. The Contractor shall provide
unscheduled maintenance and repair services as necessary to ensure the
equipment remains in good operating condition. Repair service shall be
achieved by returning failed components of a system to full operational
capacity. These repair services may consist of calibrating, cleaning,
oiling, adjusting, replacing parts broken or worn beyond useful life
(excluding glassware), and maintaining the equipment, including all
intervening calls necessary between regular services and calibrations.
Repair shall be carried out with the objective of minimizing downtime.
Service calls to the Contractor are only authorized when they are
received from the Contracting Officer, COTR or authorized designee.
Work performed outside the normal hours of coverage at the request of
FSE will be considered service during normal hours of coverage. Service
responses on calls from unauthorized personnel may result in
nonpayment. Response Time: Contractor's FSE must respond with a phone
call to the COTR within one (1) hour after receipt of telephoned
notification. If the problem cannot be corrected by phone, the FSE
shall commence work (on-site physical response) within four (4) hours
after receipt of notification and shall proceed progressively to
completion without undue delay. All equipment listed shall be operable
and available for use 100% of the normal hours of coverage. Downtime
shall be computed based on hours of coverage, beginning when the
request for service is initiated and ending when the equipment is
returned to full operational condition and accepted by the using
service. Scheduled service shall be excluded from downtime. Downtime
shall be computed quarterly. Failure to meet this requirement will
subject the Contractor to Penalties or Default action stated in the
terms of this contract. The Contractor shall furnish and replace all
equipment replacement parts (excluding glassware). These parts are
included in the price of this contract. The Contractor shall have ready
access to all equipment parts, including unique and high mortality
replacement parts, in order to minimize downtime and meet equipment
uptime requirements. Only new standard parts (manufactured by the maker
of the equipment or equal thereto) shall be furnished by the
Contractor. Rebuilt parts, used parts, or those removed from the same
model of equipment shall not be installed. All parts supplied by the
Contractor shall be of current manufacture and have complete
versatility with the presently installed equipment. All parts shall
perform identically to the original equipment specifications. All
modifications, upgrades, updates, or enhancements, must be scheduled
inadvance with the COTR. The COTR must receive notice at least 1 week
in advance before any equipment updates, upgrades or enhancements are
begun along with justification (if Vendor-suggested modification),
estimated costs (if applicable), probable effect on equipment
operation, and needs for new or additional in service training.
Approval of the COTR and a VAMC equipment pass must be obtained before
removing equipment to Contractor's plant. The Contractor will be
responsible for loss or damage of equipment. The VAMC shall not provide
service manuals or service diagnostic software to the Contractor.
Within 30 days after award, the Contractor shall provide the VAMC with
a copy of the preventive maintenance procedures to be used, provide a
copy of the current calibration/ certification of all test equipment
which shall be used by the Contractor on the equipment, and shall
inspect/reject any equipment deemed to be in poor operating condition.
Failure to reject such equipment shall constitute acceptance. Upon
rejection, the CO shall be notified in writing as to the specific
item(s) of equipment deemed to be in poor operating condition. Test
equipment shall be traceable to a national standard, and shall be
periodically checked for compliance. MANDATORY CHECK-IN PROCEDURES. The
Contractor's FSE shall be required to report to the COTR in Room
CG105-1, during normal working hours, prior to and after any work is
performed, every day that is required to complete the job. At this time
the FSE will be issued a contractor's identification badge which will
be displayed at all times while on VAMC property, and surrendered upon
completion of the job. Also at this time the FSE will be required to
enter the following information into the log: name, name of contractor,
date, time in, location of service/equipment being serviced, and time
out. When service is completed, the FSE shall document services
rendered on a properly completed ESR. The FSE shall be required to log
out with Biomedical Engineering and submit the ESR(s) to the COTR. All
ESRs shall be submitted to the equipment user for an "acceptance
signature" and to the COTR for an "authorization signature" if the COTR
is unavailable, a signed, authorized copy ofthe ESR will be sent to the
Contractor after the work can be reviewed (if requested or noted on the
ESR). When the job cannot be completed by 4:30 p.m. during normal
working hours, a status of progress, in the form of an ESR and verbal
description, must be provided to the COTR before 4:00 p.m. There shall
be no additional charge for time spent at the site awaiting the
arrival of additional FSE and/or delivery of parts. Outside normal
working hours when the COTR is unavailable, FSEs shall be required to
log in and out with Security/Police service in the VAMC lobby or room
1A114 and receive proper identification badges. ESRs for these
services, both completed and left in progress, will need an "acceptance
signature," and should be dropped off at a point agreed upon with the
COTR. Documentation in the form of ESRs must be furnished to the COTR
for all scheduled and unscheduled maintenance performed by the
Contractor. Failure to comply may result in delayed payment.
Documentation shall include detailed descriptions of scheduled
maintenance and emergency repairs, procedures performed, including
replaced parts and prices, for outside normal working hour services
required to maintain the equipment. The ESR shall consist of a separate
report for each equipment item covered under the contract. ESR must, at
a minimum, document the following data legibly and in complete detail:
name of contractor, name of FSE who performed services, contractor
service ESR number/log number, date, time(starting & ending), equipment
downtime and hours on-site for service call; VA purchase order
number(s) covering the call(for contact or one provided for authorized
work performed outside normal hours of coverage or not covered by the
contract); description of problem reported by COTR/user (if
applicable); identification of equipment to be serviced: device
name/description, device location (if applicable), manufacturer's name,
model number, serial number, inventory/barcode number, and any other
identification numbers; itemized description of service performed and
parts replaced; results of calibration and/or performance testing;
total cost to be billed if part(s) are not covered or service rendered
after normal hours of coverage; Signatures: FSE performing services
described; acceptance signature as described above; authorization
signature by COTR if available. Any additional charges claimed by the
FSE/Contractor must be approved by the COTR before the service is
completed. A purchase order number must then be provided to the
FSE/Contractor by the COTR. The Contractor shall immediately, but not
later than 24 hours after discovery, notify the CO and the COTR, IN
WRITING of the existence or the development of any defects in, or
repairs required to the schedule of equipment which the Contractor
considers not to be responsible for under the terms of the contract.
The Contractor shall furnish the CO and the COTR with a written
estimate of the cost to make necessary repairs. Invoices will be paid
in arrears on a monthly basis. The Contractor shall mail the invoices
to the attention of Fiscal Service. Invoices MUST INCLUDE, at a
minimum, the following information: Contractor name, purchase order
number, period of service the billing covers, list of equipment items
and their serial numbers covered during the stated period of service.
Each invoice must be accompanied by legible copies of all the ESRs for
the services or period of service listed on the invoice, in order to
expedite verification for payment. The Contractor shall have fully
qualified FSE performing all service on the equipment under the
contract. Within a 30 day period after award of the contract, the
Contractor shall submit a list of the fully qualified FSEs who whall
perform the contracted service at this VAMC for each make and model of
equipment on the equipment schedule. The list for each FSE performing
work at this VAMC will include: name, geographic location, length and
type of experience maintaining medical equipment (specific to make and
model of equipment), and their formal training (specific to the make
and model of equipment). The Contractor shall provide written assurance
of the competency of their personnel and a list of credentials of
approved FSEs for each make and model the Contractor services at the
VAMC. The CO may authenticate the training requirements, request
training certificates or credentials from the Contractor at any time
for any personnel who are servicing or installing any VAMC equipment.
The CO and COTR specifically reserve the right to reject any of the
Contractor's personnel and refuse them permission to work on the VAMC
equipment. If subcontractor(s) are used, they must be approved by the
CO; the Contractor shall submit any proposed change in subcon-
tractor(s) to the CO for approval or disapproval. The following FAR
provisions apply to this solicitation. 52.212-1 Instructions To
Offerors-Commercial Items; 52.212-3 Offeror Representations &
Certifications -- Commercial Items; 52.212-4 Contract Terms &
Conditions -- Commercial Items; 52.212-5 Contractct Terms & Conditions
Required To Implement Statues or Executive Orders-Commercial Items;
52.222-3 Convict Labor (E.O. 11755); 52.233-3 Protest After Award;
52.203-6 Restrictions on Subcontractor Sales to the Government, with
Alt. I; 52.203-10 Price or Fee Adjustment for Illegal or Improper
Activity; 52.219-8 Utilization of Small Business Concerns; 52.219-9
Small Business Subcontractors Plan; 52.219-14 Limitation on
Subcontracting; 52.222-26 Equal Opportunity; 52.222-35 Affirmative
Action for Special Disabled & Vietnam Era Veterans; 52.222-36
Affirmative Action For Workers With Disabilities; 52.222-48 Exemption
From Application of Service Contract Act Provisions For Contracts For
Maintenance, Calibration, and/or Repair of Certain ADP, Scientific &
Medical, and/or Office & Business Equipment- Contractor Certification.
All bids for this procurement must be received in a SEALED ENVELOPE,
be on company letterhead and include a completed copy of the provisions
at 52.212-3, Offeror Representations & Certifications-Commercial
Items, Bidders shall identify all bid packages by writing the
solicitation number on each package. Bids are due no later than 2:00
p.m.(EDLS) August 30, 1999, and shall be addressed to Joyce Forker,
Contracting Officer (90C), Room 1B112, VA Medical Center, 50 Irving
St., NW, Washington, DC 20422 -BID ENCLOSED. No telephonic or faxed
requests will be honored. Posted 08/12/99 (W-SN367030). (0224) Loren Data Corp. http://www.ld.com (SYN# 0055 19990816\J-0002.SOL)
J - Maintenance, Repair and Rebuilding of Equipment Index Page
|
|