COMMERCE BUSINESS DAILY ISSUE OF AUGUST 18,1999 PSA#2412DOE/WSSRAP, 7295 Highway 94 South, St. Charles, Missouri 3304 Y -- FACILITIES CONSTRUCTION SOL RFP-3589-SC-WP515 DUE 100199 POC W.E.
Berry, Subcontract Administrator. Furnish all material, labor, and
equipment to install Groundwater Interceptor Trench System, extraction
wells, precast concrete valve vaults, pumps and piping with related
power and instrumentation systems required to operate and transport
extracted groundwater to existing equalization and effluent pond(s).
Excavate contaminated soil and connect new piping to existing piping.
Transport contaminated soil at the Contractor's direction to the
chemical plant (approximately 4-miles) via dedicated Quarry Haul Road.
Haul uncontaminated waste to a licensed off-site facility. Provide
dust and emission control, including exhaust and non-radioactive air
dust and emission control, including exhaust and non-radioactive air
particles. Clean and decontaminate equipment at the trench site. Wet
decontamination of equipment shall take place at the chemical plant
decontamination of equipment shall take place at the chemical plant
decontamination pad. Excavation to top of bedrock of the 550 foot long
groundwater interceptor trench shall be accomplished using the
continuous trenching method. The trench side wall shall be supported
while installing the perforated, 4-inch diameter HDPE flexible side
walls pipe along the base of the trench, and backfilling with granular
fill material all performed using the ``single pass'' installed
method. The interceptor piping shall be covered by a polyester ``sock''
envelope. After backfilling is complete the area shall be smoothed and
seeded. Solicitation packages may be obtained by written request ONLY
to the address above, or by telefax to (636) 441-8073. Point of
contact: W. E. Berry, Subcontract Administrator. Posted 08/16/99