COMMERCE BUSINESS DAILY ISSUE OF AUGUST 18,1999 PSA#2412Department of The Army, Directorate of Contracting, 1042 William H.
Wilson Avenue, Suite 209, Fort Stewart, Georgia 31314-3322 Z -- INSTALL 25 TON AIR CONDITIONING SYSTEM, BLDG 4502, FORT STEWART,
GEORGIA SOL DAKF10-99-R-1082 DUE 052299 POC Contract Specialist is
Kathy Morgan, (912) 767-8462 WEB: Fort Stewart's Directorate of
Contracting's Homepage, http://www.stewart.army.mil/doc/intro.htm.
E-MAIL: Click here to e-mail the Contract Specialist,
morgank@emh5.stewart.army.mil. The Army requires a contract for the
furnishing of all labor, material, and equipment and performing all
work necessary to install 25 Ton air conditioning system in Building
4502, Fort Stewart, Georgia. Work includes but is not necessarily
restricted to: furnishing and installing a 25 ton air conditioning
system, furnishing and installing solenoid valves in liquid lines at
air handler per manufacturer specifications, furnishing and installing
sight glass and filter drier in each liquid line at split evaporator
coil, furnishing and installing all necessary piping, changing air
filters at the air handler, running low voltage wiring, furnishing and
installing steel frame and vibration isolators under the air handler
as required to support the unit, sleeving and sealing all electrical,
refrigeration, and drain piping through walls; furnishing and
installing mushroom type outside air vent with roof curb, spring loaded
aluminum backdraft damper and bird screen on roof above the air
handler, lining the first 10' of supply duct, insulating all ducts,
performing all sheet metal ductwork construction as required,
installing all ductwork, installing new breakers in existing
panelboard, installing new copper conductors, installing new disconnect
switches, installing new conduit, installing new receptacles,
installing new plated steel channel, installing a new unit thermostat,
installing pvc drain line, installing new automatic reservoir
condensate removal pump, installing copper pipe, installing copper
drain line, installing pipe straps, cutting out 2 openings through CMU
walls to support the air conditioning work. Performance time is 45
calendar days after receipt of the notice to proceed. SIC code for this
project is 1711. Project is unrestricted, all responsible businesses
may submit an offer. Magnitude of this project is between $25,000 and
$100,000. There is no charge for the solicitation package. When
ordering a package, please refer to DAKF10-99-R-1082 and give a brief
description of the project. All requests for solicitation packages
should be addressed to: DPW/DOC Cell, Building 1139, 1557 Frank Cochran
Drive, Fort Stewart, Georgia 31314-4928. The number of solicitation
packages available is limited and will be distributed on a first come,
first served basis. Posted 08/16/99 (W-SN368195). (0228) Loren Data Corp. http://www.ld.com (SYN# 0129 19990818\Z-0013.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|