COMMERCE BUSINESS DAILY ISSUE OF AUGUST 27,1999 PSA#2420National Park Service, 600 Harrison Street, Suite 600, San Francisco,
CA 94107-1372 S -- GARBAGE COLLECTION AT GREAT BASIN NATIONAL PARK, NEVADA SOL
RP842099101 DUE 091399 POC Gordon Keller, 415-427-1443 or Jamie
Sherrill, 415-427-1337 This is a COMBINED SYNOPSIS/SOLICITATION for
commercial items prepared in accordance with the format in Subpart
12.6, STREAMLINED PROCEDURES FOR EVALUATION AND SOLICITATION FOR
COMMERCIAL ITEMS as supplemented with additional information included
in this notice. This announcement constitutes the only solicitation;
proposals are being requested and A WRITTEN SOLICITATION WILL NOT BE
ISSUED. This solicitation is a BEST VALUE procurement and is issued as
Request for Proposal # RP842099101. The Federal Acquisition Regulation
(FAR) clauses and provisions enclosed within are those in effect
through Federal Acquisition Circular (FAC) 99-11. The Government
intends to issue a single, firm fixed price contract to the responsible
offeror whose total offer for all Line Items is the best evaluated
value for the Government, price and other factors considered. The
Government intends to AWARD WITHOUT DISCUSSIONS, but reserves the right
to negotiate should the Contracting Officer determine it necessary. FAR
clauses andprovisions are available to be viewed and printed through
Internet access at http://www.arnet.gov/far. The standard industrial
classification code is 4212 and the small business size standard is
$6.0 million. This solicitation is without restriction and is offered
as full and open competition. The National Park Service encourages the
participation of small, small disadvantanged and women owned business
enterprises. The following is a description of the requirements for
this acquisition: GENERAL: The Contractor shall provide the necessary
personnel, facilities, services, material and equipment including
containers and transportation to furnish commercial type garbage and
debris collection at Great Basin National Park (GRBA), NV and to
dispose of such at an approved site. This requirement of solid waste
collection an disposal service covers the BASE period of October 1,
1999 through September 30, 2000, with OPTIONS to extend the service for
the periods of October 1, 2000 through September 30, 2001; October
1,2001 through September 30, 2002; and October 1, 2002 through
September 30, 2003. DESCRIPTION: (a) Garbage Collection will consist of
emptying and disposing of garbage and debris in and adjacent to all the
provided containers within GRBA. Such debris shall include all
household garbage, refuse, trash, and unneeded or worn out items
generated by the administration and operations of the park. (b) Garbage
Containers provided by the Contractor for use in this contract must
comply with the following standards: (b-1) constructed of metal and
painted a forest green color; (b-2) water tight; (b-3) equipped with
wind-resistant covers that an average adult can lift without strain;
(b-4) minimum capacity of 2 cubic yards; and (b-5) cleaned and
disinfected at the start of the contract. (c) Garbage containers shall
be placed in locations designated by the Contracting Officer or
designated representative (see Offer/Bid Schedule). (d) Contractor
shall service each container at each service area in accordance with
the appropriate pick up schedule in effect (see Offer/Bid Schedule).
The Contractor shall be responsible for the pick up of all trash
spilled or lost during collection. (e) Contractor shall maintain all
containers in a manner which will reflect high credit upon the National
Park Service (NPS) and upon the Contractor. Containers shall washed,
disinfected, and repainted the forest green color annually, or at the
direction of the COR. Any holes or other defacements shall be
immediately repaired in compliance with all applicable sanitation codes
and repainted to prevent further damage. Cover handles and hinges shall
be repaired promptly, as needed. The NPS shall not be responsible for
damage or loss to the Contractor's containers, including but not
limited to acts of vandalism or malicious mischief. (f) The selection
of the dump site is the responsibility of the Contractor. Garbage shall
be disposed of outside of the park boundaries in accordance with all
applicable Federal, State and Local regulations. (g) All dumping fees
shall be paid by the Contractor and are not reimbursable. WORK
SCHEDULE: The normal collection schedule will be each Friday and each
Monday, from mid-April through September, and twice monthly on Fridays
only, for the remainder of the year (see Offer/Bid Schedule). If a
legal holiday occurs on a Friday or a Monday, the required collection
will be made on the day following the holiday. Each service day is to
include the servicing of all garbage containers regardless of the
number of separate loads or trips the Contractor may have to make to
and from the disposal center. Any unusual change to the work schedule
or delays for any reason shall be reported within 24 hours to the COR.
The Contractor shall assure proper service of all sites, in accordance
with the terms of the contract. CONTRACTOR PERSONNEL: All Contractor
personnel who will perform the services for this contract shall meet
the following minimum qualifications and standards: (a) Must be
qualified through training and experience to operate the Contractor's
equipment; (b) must be licensed to operate said equipment; (c) must be
neat in appearance; (d) must accomplish the requirements of the
contract in orderly and business-like manner. At a required post award
conference, and prior to the initiation of this contract, the
Contractor shall designate in writing the scope and authority of a
person to act in behalf of the company in the absence of the
owner/manager. EQUIPEMENT REQUIREMENT: The contractor shall use
vehicles equipped with compactor-type units for collection and
transportation of refuse. These units shall be sealed to prevent loss
of waste materials while collecting and transporting garbage. All
vehicles for use in the performance of this contract shall be kept
clean, in good mechanical condition, painted to present a neat
appearance, meet the State of Nevada Safety and Emission Control
Standards, show evidence of semi-annual safety inspections and display
proper registration and license. All Contractor's vehicles shall be
equipped with approved backup alarms, which shall be maintained and in
proper operating condition at all times. In the event of mechanical
breakdown, the Contractor shall arrange for reserve equipment, meeting
all equipment requirements, and shall meet all terms and conditions of
the contract. Contractor vehicles shall be operated only on designated
roadways, driveways, or parking areas. POST AWARD CONFERENCE:
Following the award of the contract and prior to the commencement of
work, the COR and designated representatives, and the Contractor, shall
meet jointly to discuss the implementation of the contract: contract
terms, conditions, intent, and clarification of all questions and
concerns. A time and date for this meeting will be agreed upon by all
parties, usually within five (5) days following the Notice of Award.
OFFER / BID SCHEDULE -- CONTRACT LINE ITEMS (CLIN): The Contractor
shall complete the unit price and extended price for all line items
including annual totals for the Base and Option Years. A grand total
for Base and Option Years shall also be presented. BASE PERIOD, Part A,
10/01/1999 through Mid-April 2000, Two pickups per MONTH, on Fridays:
CLIN #001, location -- maintenance yard, 1 container, estimated 13
pickup dates, UNIT PRICE $__________TOTAL $____________; CLIN 002,
location -- RV Dump Station, 9 containers, 13 estimated pickup dates,
UNIT PRICE $__________ TOTAL $____________. BASE PERIOD, Part B,
Mid-April 2000 through 09/30/2000, Two pickups per WEEK, Mondays and
Fridays: CLIN #003, location -- maintenance yard, 1 container, 49
estimated pickup dates, UNIT PRICE $___________ TOTAL $____________;
CLIN #004, location -- RV Dump Station, 9 containers, 49 estimated
pickup dates, UNIT PRICE $___________ TOTAL $____________. TOTAL BASE
YEAR $_________________. One time collection rate, CLIN 1&2 combined
$___________ NOT part of the offer and will not be evaluated. OPTION
PERIOD #1, Part A, 10/01/2000 through Mid-April 2001, Two pickups per
MONTH on Fridays: CLIN #005, location -- maintenance yard, 1 container,
13 estimated pickup dates, UNIT PRICE $___________ TOTAL $____________;
CLIN #006, location -- RV Dump Station, 9 containers, 13 estimated
pickup dates, UNIT PRICE $___________ TOTAL $____________; OPTION
PERIOD #1, Part B, Mid-April 2001 through 09/30/2001, Two pickups per
WEEK, Mondays and Fridays: CLIN #007, location -- maintenance yard, 1
container, 49 estimated pickup dates, UNIT PRICE $___________ TOTAL
$____________; CLIN #008, location -- RV Dump Station, 9 containers, 49
estimated pickup dates, UNIT PRICE $___________ TOTAL $___________.
TOTAL OPTION PERIOD #1 $_________________. One time collection rate,
CLIN 1&2 combined $___________ NOT part of the offer and will not be
evaluated. OPTION PERIOD #2, Part A, 10/01/2001 through Mid-April 2002,
Two pickups per MONTH on Fridays: CLIN #009, location -- maintenance
yard, 1 container, 13 estimated pickup dates, UNIT PRICE $___________
TOTAL $____________; CLIN #010, location -- RV Dump Station, 9
containers, 13 estimated pickup dates, UNIT PRICE $___________ TOTAL
$____________; OPTION PERIOD #1, Part B, Mid-April 2002 through
09/30/2002, Two pickups per WEEK, Mondays and Fridays: CLIN #011,
location -- maintenance yard, 1 container, 49 estimated pickup dates,
UNIT PRICE $___________ TOTAL $____________; CLIN #012, location -- RV
Dump Station, 9 containers, 49 estimated pickup dates, UNIT PRICE
$___________ TOTAL $___________. TOTAL OPTION PERIOD #2
$_________________. One time collection rate, CLIN 1&2 combined
$___________ NOT part of the offer and will not be evaluated. OPTION
PERIOD #3, Part A, 10/01/2002 through Mid-April 2003, Two pickups per
MONTH on Fridays: CLIN #013, location -- maintenance yard, 1 container,
13 estimated pickup dates, UNIT PRICE $___________ TOTAL $____________;
CLIN #014, location -- RV Dump Station, 9 containers, 13 estimated
pickup dates, UNIT PRICE $___________ TOTAL $____________; OPTION
PERIOD #3, Part B, Mid-April 2003, through 09/30/2003, Two pickups per
WEEK, Mondays and Fridays: CLIN #015, location -- maintenance yard, 1
container, 49 estimated pickup dates, UNIT PRICE $___________ TOTAL
$____________; CLIN #016, location -- RV Dump Station, 9 containers, 49
estimated pickup dates, UNIT PRICE $___________ TOTAL $___________.
TOTAL OPTION PERIOD #3 $_________________. One time collection rate,
CLIN 1&2 combined $___________ NOT part of the offer and will not be
evaluated. BID SUMMARY: Base year, CLINS 001-004 $__________________
Option Year 1, CLINS 005-008 $__________________ Option Year 2, CLINS
009-012 $__________________ Option Year 3, CLINS 013-016
$__________________ TOTAL BID $__________________ Offerors/Bidders must
review and comply with the FAR Provisions or Clauses which apply to
this solicitation. This information is available on the Internet at
http://www.arnet.gov/far. The following clauses or provisions are
specifically referenced and are required in the response to this
solicitation: 52.212-1, INSTRUCTIONS TO OFFERORS-COMMERCIAL ITEMS;
52.212-2, EVALUATION-COMMERCIAL ITEMS -- Evaluation factors include [a]
Demonstrated technical capability of contractor to meet specifications
of contract, [b] past performance supported by documentation and
references, [c] price. Technical and past performance, when combined,
shall be equal to price in importance; a completed copy of the
provision at 52.212-3, OFFEROR REPRESENTATIONS AND
CERTIFICATIONS-COMMERCIAL ITEMS, must be submitted with the bid/offer;
52.212-4, CONTRACT TERMS AND CONDITIONS-COMMERCIAL ITEMS; 52.212-5,
CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS-COMERCIAL ITEMS, with the following paragraph (b)
clauses, indicated by number 1, 5, 11, 12, 13, 14, 15, 22, and in
paragraph (c) clauses indicated by number 1, 2, 3, 4, 5. OFFERS ARE DUE
for this combined synopsis/solicitation on September 13, 1999, at 2:00
PM, and shall be delivered by the specified time to the National Park
Service, Pacific Great Basin Support Office, 600 Harrison Street,
Suite 600, San Francisco, CA 94107, ATTN Contracting Office: RFP
#RP842099101. Offerors must furnish the company name, DUNS number,
address, phone and fax number, email address if available, and official
point of contact. Questions regarding this solicitation should be
referred to Gordon Keller, 415-427-1443, or Jamie Sherrill,
415-427-1337. Posted 08/22/99 (W-SN370895). (0234) Loren Data Corp. http://www.ld.com (SYN# 0109 19990827\S-0002.SOL)
S - Utilities and Housekeeping Services Index Page
|
|